Just a few matters before we get into Dr Mealy.
Firstly, ID documents. I don't think I can see them on the website.
I don't know if I'm looking in the wrong place.
Unfortunately I can't upload them myself. It has to go through a records management team.
So hopefully as soon as he logs on this, I'm assuming he's probably doing it now,
but I can just drop a message and just spur that along.
But it's being actioned.
Okay, yes, can you please do that,
because we might need to refer to them at some point,
and that would be helpful, thank you.
In terms of the 106, so yesterday evening,
I read the 106 EUU and the schedule,
so I'm well versed in that in terms of anything
that links to the viability discussion.
Just to flag this now, really,
so that both sides know before the witnesses stand up.
One thought I had, and I didn't actually have time
to properly cheque, this was already in the evidence,
so it might be.
Does the existence of an early or late stage review
in itself affect viability as we're considering it now?
And if so, how should that be accounted for?
So yes, if that could be discussed with the witnesses,
please.
And then do we have a sealed compliance statement from the council?
No, but I believe it's in progress and it can be with you. I think there is some question
about how to frame it when we don't have an agreed section 106, but we can get that to
you. I'll just double cheque with my instructing solicitor, but imminently.
Okay, yes, so if that could just be as soon as possible, please, because I want to review
that ahead of the roundtable session.
Thank you.
Okay, that's everything for me.
Is there anything else you wish to raise before we turn to Dr Mealy?
Just in terms of choreography I'm going to you know about Dr. Meale having to sit up at the top there
behind you to the left while he's doing with the screen will be visible won't it so I think for
you that one can you see a screen properly I mean I can just turn around yes yeah you may you may
No one's been angled for the public.
But anyway, as long as you can see, he'll be over there.
And then what I thought, what we thought was that he would then go down there to be cross -examined
and we can all see the osteopaths and hear him cross -examine.
Yes, and Mr. Bistro's nodding as well, so yes, that makes sense.
Thank you.
Fine.
So in that case, if you're ready, I'll ask Dr Mealy to go across and I will introduce
him and then we'll start the examination in chief and Dr Mealy will go through the slides
and I'll be chipping in and asking the relevant questions and so on.
Okay, thank you.
Just so you know, I've been told by the council I need to turn off my microphone otherwise
the live stream is always on me unless I'm speaking.
So I'm assuming for everybody's benefit, I think whenever you're speaking, make sure
microphones on not just for the room but for people online. Yes sir, thank you very much.
Yes, it did.
I think the environmental conditions in here are sub -optimal in general.
I don't know, I'm sure the council is taking steps to deal with the smell but it's not
great to be honest.
Apparently it takes three days to fix.
That's all I know.
So I don't think it's something we can fix.
But I mean, facilities management are aware.
I'm sure, as I said, I'm sure the council is taking steps but if it gets much worse
then, you know, it's quite difficult.
Okay, thank you very much.
No, no, we're managing.
Yeah, okay. So and so if you've got dr. Miele's proof, which has got a summary at the front
I'm just going to introduce him from the
from the first few pages of that and then I'm gonna hand over and
We'll do a bit of a double act on the slides as they go through
So, dr. Miele
If you're ready
Good morning. Your your name is some Chris Miele. Is that right? Correct, and I'm looking here at
It's page seven of your proof where you set
out your qualifications and your experience,
Chinatown Planner, IHBC, 35 years of experience,
and then your academic as well as practical
and employment background.
Is that all right?
That's correct, yes.
You give us a number of examples of the work
You've been involved in in London in particular in the past few years on those next few pages and then at two point
17 which is on page 9
You pick up the points about your involvement with these proposals and just say it's slightly unusual
I think you know slightly out of the ordinary when you were involved here and so on. Can you give a
Just say a word about your involvement in the debate
I was first contacted about the site, sir, in early 2023,
round about the time, if not before, the architects were appointed.
There was some massing and feasibility work being done
and we were instructed early February.
We carried out a baseline analysis,
survey of heritage assets, character, townscape appraisal,
which was provided as baseline information for the design team.
And I have been, as I explained in my evidence,
quite closely involved at every stage of the design evolution
and that baseline study we carried out has been a sort of constant feature
that we've, as I'll explain, gone back and tested the scheme against.
And that work did include obviously pre -application discussions
with the local authority.
So I think from the beginning notwithstanding the existing
building was neither listed nor identified as an appraisal. Our initial appraisal was
that it at least had some historic interest and in the first months of our instruction
we did quite a detailed analysis and a comparative study with other cinemas listed and otherwise
and into the particular facts of the designer. So we had a really good understanding of the
building from the beginning and from the start of our discussions with Tower Hamlets I think
there was an understanding that the building was a non -designated heritage asset so it
never really in question.
I mean I will touch on this briefly in my own chief, but what I will say to the inquiry
here is that quite early in that process, recognising the status of the building and
the development plan policy on non -designated heritage assets and conservation areas, we
and in discussion with the local authority,
certainly at their encouragement and our prompting
of the client, an options analysis was undertaken.
And I'll describe the terms of that briefly when I get to it.
And that took place roughly between, it started probably
and shortly after our instruction.
And then it was published, I forget the date of it,
but we sent it to local authorities as part
of the pre -app process,
along with a historic building analysis as well.
These are the five topics I'd like to cover and as part of that coverage there's going
to be a movement between heritage and townscape,
just because it's convenient in the context,
because the images are the same.
So this is the structure of what I'm going to discuss briefly.
All of the references to the images are on the images.
They're all before you, sir.
And I'm not, I'm just going
to draw out some main points, I think.
And in that process, reflect
on the evidence I heard yesterday.
So with that, I'm going to start with the existing building.
So the work we did early
in the instruction involved research in the archives of Tower Hamlets, which retains the
original drawings for the building, which were extremely helpful.
And they were helpful, incidentally, to the options analysis, because they showed structural
form, which is a steel -framed building on a concrete foundation with a small basement.
And I just draw attention, really, to the elaborate nature of the as -proposed façade
in 1939.
bearing in mind there's a building, cinema building boom, sir, in the 1920s and it's
kind of coming to an end at the end of the 1930s. And this slide also illustrates
what I think is a very stark contrast between the very small entrance element
at the front architecturally and the rear. And I'll give a little reason for
that later, I'll summarise why that is. When you look at the building actually
when it was completed, this is in the evidence, there was a good deal of
simplification in the design. The original design actually had some sophisticated detailing
to it in faience. The empire word was integrated, you may recall, with the top of the building.
And there's a good deal of simplification, I surmise, I guess, that perhaps, you know,
value engineering during the course of the design. Probably, as I said again, it's at
the end of the cinema building boom. The cinema itself is designed by William R. Glenn, who's
as Wiegen, begins to design cinemas in Scotland and then moves to London in 1929, where he
becomes effectively ABC's house architect. So ABC is one of those cinema companies like
the Go -Mont. There's many at one point 75 cinemas he designed for him, most of which
are closed and three are listed. And his cinema style, sir, is characterised by the use of
what's sometimes called the modern or art deco style, both inside and out.
So historically it's interesting for those associations with Glenn and ABC but also to
note it, I suppose, as a sort of swan song of cinema building.
It's also quite different to interwar cinemas.
If you think about interwar art deco, modern cinemas, you think usually about big frontages
and really grand gestures architecturally, slightly meretricious or snazzy, you know,
designed to grab attention and for reasons I think we understand I'll come to.
There wasn't that scope available for them.
The cinemas since then has had kind of a chequered history.
It continues in its single form with about 1 ,500 seats to the 1970s when it's triplexed.
It's then sold in 1986 to Canon Cinemas and then sold again to Coronet
and only three years later it's closed and then it's vacant for ten years until Mr. Walker -Habron buys it in 1999 and invests money in it.
And you see some of the changes that took place across that period of time so that some sort of 1960s style ornament has been added to the front.
You see in the centre slide there.
You see also what the state of play was at about in the late 1980s.
You see the Ordinance Survey maps.
By that point, the brewery appears to have been partly cleared.
Not surprising that the retail park hadn't been constructed and Cooper's Cloaks to the
north had been laid out by that point in a manner very typical of what you find in the
east end from the 80s, really low density, in a sense sort of suburban in character really.
I put this slide at the beginning because I think it demonstrates what is frankly the
stark difference between me and my fellow expert on the point.
I think we can agree, and you can record, that we both find the rear and side elevations
to be utilitarian in character.
We differ, I think, as to the merits of that utilitarian character, and to me these elevations,
like any kind of embellishment. They're comprised of actually poor quality brick. There's no
consideration given to the massing of the building or relief. Those pilaster strips
you see on the slide there are effectively the position of the internal columns, so they
will be over -cladding the columns. And so for me, this is for reasons I'll explain,
these are parts of the building never meant to be seen effectively. And there are plenty
of cinemas, obviously cinemas have big auditoria, but if you may know the Brixton, for example,
which is a concert venue now, but where they're exposed, they have higher quality brick on
the rear elevations, and at least some attempt to relieve the bulk, and there's nothing here
at all in that nature.
There it is in elevation, I'll come back to the relationship obviously with Bill Vuteris,
because that seems to me to be a key area of debate, and an interesting point of debate,
and I don't mean to be flippant when I say that.
And just some views I think to give you a feeling overall for what it looks like and you may have seen these.
The cinema undoubtedly had some architectural...
Sorry to interrupt sir. We were given a copy of the slideshow yesterday but this seems to be a different...
I've been trying to follow it along but this is a different slideshow to the one that we were given yesterday.
I don't think so.
So I just want to cheque if the slide has changed or if I've received the right one.
You know, I think everything, there might have been a rearrangement of a slide, but I think it was the same.
All the images there.
I mean, I think I've seen them, but they're just in a completely different order, and I just want to know if things have changed.
It is not the same as the one I've got, because...
Well, I apologise for that. There might have been some rearrangement and a different one was sent, but there are no new images in it.
I've got the same one as my new friend, so...
I've seen those images obviously as well, but I haven't got them
in the whole copy that I've got either.
They're all in the evidence.
I just wanted to cheque because obviously when it was
in the same order it's.
I will reassure the inquiry that there are no new images.
As I said at the beginning, one or two have been rearranged
because I thought that had been sent through,
so I apologise as a clerical error.
and I will then therefore replace this, so that the inquiry has the actual order.
So many apologies for that.
The building clearly has architectural interests, as demonstrated in the foyer,
which you see there in its original condition,
and the main auditorium, which I said was very large,
it's a typical interior and it has some historic associations with important figures.
You see there Barbara Windsor, who I think was present at the 1999 opening of the cinema,
which is seen in the information.
It's been said that the cinema represents a kind of inventive and creative approach to layout and design.
I have to say I don't agree with that. I think that the layout is pretty expedient.
You've got a long thin entrance lobby and you've got to get people up to the main or the upper tier and to the lower tier.
And in fact in terms of spatial elaboration, ornamental elaboration, it's pretty basic.
but characteristic. The auditorium obviously has been subdivided, you see in the lower right there.
The light fittings which were mentioned yesterday are actually part of the recent refurbishment,
and effectively the upper auditorium has been blocked off from the lower.
It's true that I think probably most of the features are there, underneath one thing or another,
but it's been carved up in the usual way for cinemas, so it's been a loss of spatial character,
and the way the building functions.
The lobby retains some elements that are original,
but also has been changed, as has the façade of the building too.
Notwithstanding all that, I think,
well, I've always recognised that the building has some historic interest,
and there's a long history of entertainment on the site I'll summarise briefly,
which I think the choir has already heard about,
but also there are these elements to it that communicate that function.
But I certainly very much see the conservation area interest
is focused in the frontage, which, notwithstanding the changes, has the kind of curved corner
and slightly simplified style you expect to see.
And from an NDHA perspective, I would agree that some of the surviving features in the
building do communicate its historic and architectural interest, albeit much changed.
I'll move on now to the second part of the presentation, which is the option study that
I've already referred to, and I'm not going to go into detail about it, because it is
quite a, well, it is quite a detailed piece of work, pardon me, and it is included, sir,
for your reference in the HTVIA as one of the appendices, so it's included in full.
And I just want to give some context as to why it was done, and with reference to what.
There are two points of reference.
The first is the policy in the local plan, SDH 3 -6, which states that there's a presumption
in favour of retaining such buildings and conservation area.
And I know from long work in this authority that they really strongly encourage the retention
of such buildings on the basis of that policy.
But there's also obviously land use planning policies that were placed.
There were really two considerations we had to look at.
And I want to make it clear though that through every one of the options,
heritage was one of the test points that we looked at.
So it wasn't just about land use.
I say in my main evidence that it's about as comprehensive a study
as I've ever been involved with.
We had five different options and if you total up all the variants,
there were 12 different scenarios looked at.
And they ranged really from what I would call in option one a kind
really low -key intensification of the cinema use involving subdivision of
Auditorium 1, the big auditorium, to actually the creation of separate
demises in one of which it was proposed to run an entertainment and events venue
and I have to say that land use option was encouraged by the council who asked
us given the proximity of universities whether there wasn't an option to do
that. We looked at that. And then the final options, four and five, actually
look at a blended scheme with some PBSA and some residential.
And I think the critical thing to emphasise is that it was a multidisciplinary study.
So it involved not just the main architect but the cinema architect.
It involved engineers, it involved M &E, a whole life cycle carbon, which was a hot topic
at this point because of the M &S case, one of my cases, and also heritage.
So it was, in my experience, very thorough.
And there is its contents page in some way.
Oops, sorry.
In some, I won't go back.
Just a flavour.
I'm not going to talk through it.
A flavour of the level of architectural design work
that was done, which was sufficient, obviously,
to do costings and viability.
And it demonstrated, as I think is agreed,
that there is no viable use to which the building can be put.
That complies with the policy for retaining community uses.
We didn't go further and look at things like office or residential because that seemed to us to be an unreasonable course to pursue because buildings like this really can't be adapted anyway to those sorts of uses easily, if at all.
Just before you leave that subject, Dr. Miele, forgive me for chipping in.
The reception, if you like, of that work, you've explained that there was some input,
obviously, in iteration with the council offices during its preparation.
When it was submitted, what was said? Were there further questions? Was it challenged at all?
It was received and noted, I think it's fair to say.
We wrote the local authority specifically to say,
do they agree, do they disagree?
We said that in a meeting too.
And we didn't get any formal response.
Insofar as I'm aware, it was not put
out for any third -party review,
which we would have been perfectly content with,
because we wanted, through that study, to come to a shared basis
of understanding on an evidence basis with the council.
However, subsequently, I think, in reporting the scheme,
and the statement of Common Ground says that they don't dispute it.
So it seems to me to prove conclusively that on any reasonable, at least medium term basis,
possibly long term basis, there's no future for the existing building.
Which I think is a significant consideration from a conservation area perspective.
Yeah, final question on this, part one of those few comments on the evidence that the Council's produced at the inquiry.
I asked Miss Lambert yesterday about her rebuttal proof where she said there may be alternative ways of dealing with the building in some respects.
Have you seen any evidence at this stage of things, at the appeals stage from the Council which seeks to disengage with or dispute the contents of that options document
that you were just talking about.
No, and neither did at any point the council suggest
they wanted us to look at other options,
which as I said, it's hard to envisage,
could reasonably be used retaining anything of the cinema.
And that was the purpose of the exercise,
was to do all these options whilst retaining
as much as we feasibly could.
It's just not feasible really to do other sorts of uses
within a building like this.
So I just then want briefly to touch
on the conservation area and the context.
And as I said, so they're kind of mushed up in a way.
I'm going to try to keep them clear.
It's accepted, I think, that matters
of setting and urban design often overlap
in urban contexts.
But, and I want to start with the history of the site,
because it is a fascinating site.
It, after the intensive development of the East End
in the 19th century, there's a music hall opened
on the site in 1848.
And that's rebuilt in the 1870s.
And that, I think, is...
Well, actually, the old music hall is what you see on the screen now
on the left -hand side, sort of polygonal form with a garden,
probably a beer garden at the back,
surrounded by what looked like to be seating areas,
possibly some trees and so forth.
But that's rebuilt entirely as a music hall in 1877.
It's Burns in 1884.
And then it's rebuilt and repurposed in 1912.
as a theatre and early cinema.
1912 is about the time you get purpose -built cinemas.
If you know the Ritzy in Brixton, there are some other places up there.
The Islington one.
It's then fully a cinema in 1928.
So by the time ABC get a hold of it in the late 30s,
they think, well, we're going to go all cinema.
But what they're stuck with in a way is that shaped site.
And what you see in the middle side is the way the theatre grew
to occupy the whole of the site.
and critically you see what that context was that Glenn had when he came to design the cinema.
So the Anchor Brewery itself completely abutted it to the north.
There was terraced housing to the east, there was an access actually on that side, Eagle Place side.
Obviously it's encapsulated by ribbon development to the south,
and you see Bellevue Place there in the left hand slide, this polygonal arrangement,
sort of respectable working class dwellings and a sort of planned ensemble facing a small public open space,
by the 1870s is partly demolished.
And it's at that point, I think, that the gardens are increased at the front,
and the little path is put in, and the big Victorian wall that you saw to the north,
that's all the work of the brewery.
Mr. Parker pointed out, and I hadn't realised this,
that at that point the brewery actually bought them and used them for workers,
so there was that interesting connexion.
But what we have today, therefore, is a remnant of that.
But I think what the history shows, then,
when you put it together with the later developments is
that you've had entertainment on the site for about 170 odd years.
And the continuity of that use, I think,
is an important consideration from a heritage perspective,
as well as a character perspective.
And I believe my fellow witness agrees that.
I think I understood her evidence yesterday
to be just that.
And there in the 1980s, and I think you've seen this before, but you see that what's
happened is that through redevelopment and demolition, this sort of big kind of iceberg
of a building has gone slightly marooned now, I sort of mix my metaphors, but it's gone
slightly marooned now, where it's exposed in a way it was never intended to be exposed.
It's obviously the whole of it's included in the conservation area because when you designate conservation areas, you include the whole building in the conservation area.
I wouldn't read anything into that in terms, but it's rightfully included in the conservation area.
The legacy now of those different histories has produced a townscape context which is quite varied.
We've been through this already, and the aerial photographs demonstrate this and you will have seen it on your sight view and have an opportunity to reflect on it again when you go back.
There's the retail park, the sort of development you just wouldn't expect to find in this part of London in these days.
There's Cooper's Close, probably called for the brewery, Cooper's, I hadn't really put it together until I was thinking about it yesterday,
but nevertheless a sort of 1980s development of the con you find in documents from this period when, you know,
authorities are really desperate for any kind of development on run -down sites.
The Wickham department store, which has expanded over the old gardens in Bellevue Terrace,
some historic development to the north and east and very mixed development to the south,
but of course the most sensitive of that context is the conservation area,
which was designated in 1973,
was extended in 2008.
And I think just for your assistance to summarise what I think
is important about the conservation area, and I think the most important
thing is its origins as a sort of satellite
linear settlement of London, Mile End,
Old and Newtown, where there was a scattering of houses
there and in Stepney Green. And a number of those houses were, in the usual way, relatively
ground houses, because you wanted to be out of the sort of dense population of inner London.
So there is that 18th, early 18th century legacy or thread, and the Myland Road itself
is part of that storey, because it's an ancient route, and so is Stepney Green, part of that
storey and the buildings there.
I mean, as you know, probably, sir, the East End changes radically because of the opening
of the docks, and it develops a working -class character socially and actually physically
that we have today.
And that brings a lot of commercial activity to the conservation area in the 19th century,
the bank, the pubs, the music hall that I've just talked about, shops, and so forth.
And I think then the third component or historical moment is the 20th century.
And the Wickham's department store, I mean a really ground department store for an outer London location.
You get them in Wandsworth now, in Brixton, you know, with these big department stores, many of which have stopped trading.
And now commercial buildings in some way.
And the cinema of course is part of that storey too, when the Mile End Road became something of a London high street.
So a complete transformation in its fortunes.
And so within the conservation area, as without it,
there's a great deal of variety and successive layering.
And interventions in some cases which are quite significant.
So the retail part, big significant change.
Cooper's Close, big change.
130 or 133 to 155 to the south, was talked about yesterday.
Modern Block of Flats, big change in that location.
But, you know, the Myland Road remains as this unifying feature, spatially.
It's in addition to having some beautiful historic buildings on it, it has a lot of
beautiful trees and has an interesting sort of setback, probably the most distinguished
historic building in the alms houses at the far end, next to the Blind Beggar, which is
famous for different reasons.
And this slide is from the DAS.
I think this is in this location, but I thought it's really important,
and it comes back later in the design response, because what the analysis I've just summarised showed
was that whatever we did on this site, we had to have regard to three contexts.
The contexts are quite varied. There's obviously Bellevue Place, which we'll come to,
which is a really distinct and discreet historic townscape element in the conservation area,
but it has its own identity, very strong, well -defined identity, which I'll come to.
There's the high street context, and then there's the Coopers close context, which,
you know, is not, I have to say it's there, and obviously we have to have contextual design,
but it's not the sort of development you take your cue from if you want to optimise the
brownfield site. It doesn't demonstrate principles of urban design we accept today, including
making best use of land.
So in some ways that was the biggest challenge, is how to respond to that.
The Anchor retail park was relatively straightforward because early on the local authority, we'd
always thought about the adjacent site, because you have to think about adjacencies, but the
local authority put in front of us a scheme that they were discussing.
And you see that's dotted an outline.
It includes a frontage and some building at the back, rising to about six floors.
So it's not consented, I know, and I don't know the status of it.
I don't think even there's an application.
But I think it's a reasonable assumption,
when you're bringing forward a site like this,
to anticipate that there will be something significant next year.
If not now, if not in five years, eventually,
within the foreseeable future,
if the plan is too valuable.
Part of that analysis then broke down the context
into materials and details, and this is a slide from the DAS.
And I will say here, sir, that early on in this project, there's no images in front of you,
but we had a singular design all the way around, which was quite streamlined, it was a bit of a take on the 1930s,
but that was revised specifically as a consequence of the discussion we had at the Design Southeast,
to the form that you see today, which is much more varied and trying to do different contexts.
This, sir, just is the townscape character map that we prepared earlier in the process,
which I don't think is a challenge, but which documents that variety.
And for your information, these are the views that we formulated early in the process
and shared with the Council and agreed with the Council.
The view to the far left is one that was added at Historic England's suggestion,
just to test intervisibility with the alums' houses, and there was none.
The frontage is an important context, obviously, and I make the point that
at the moment from a townscape perspective, the existing site is a bit of a gap in the toothy smile.
I mean, it's lower than the extended historic bank building now a mosque,
and it's even lower than the block of flats to the right.
So it's, I wouldn't say it's harmful, but it certainly presents the opportunity to do a more appropriate infill in that location.
And not least, at the moment, you see the unadorned part of the cinema building from the High Street,
and I think it's an intrusive feature, actually.
I mean, obviously, Bellevue Place is, you know, I have to say,
just, and I am very respectful and mindful
of the residents here, it's one of the features of this,
it's a feature of this case that I think is, I'll be honest,
challenging, and it invites a lot of different,
or it invites different points of view.
And, you know, I've read,
I read carefully what the Rule 6 party said
in the statement of case.
I reflected again on the objections and thought about it a lot in the evidence.
And it's covered quite extensively in the evidence as a consequence.
And I think there's nothing between the parties, sir, about why the buildings are listed and in the conservation area.
I mean, they're a really good example of a late Georgian working -class terrace, pretty intact, actually.
It's exactly the sort of buildings that would be listed.
Lots of buildings like that in Tower Hamlets are listed.
I'm not saying they have the same setting.
Lots of buildings like that are listed though.
And I think it's common between the both parties
that the setting of these buildings does contribute
to an appreciation of their significance.
I mean I in evidence call them a secluded cul -de -sac.
I explain how their sense of separation
creates a sort of atmosphere.
That's reinforced I say by vegetation.
there's the intimate scale, and there's spatial enclosure, which is pronounced,
because you have to enter through an arch and then there's a big building at the back.
And I think the experience is relevant to the way you appreciate that architectural and historic interest.
I wouldn't say it's the reason for listing or it's the only thing that's interesting about them, but it is relevant.
And I just refer and reflect on Mr. Parker's video because it starts, I think, very thoughtfully
by him at the door to the place and he says, here I am just a few yards from Myland and
would you believe it opened the door. And it is surprising when you walk in. You know,
you're close to Myland Road and suddenly you're in this space which is secluded, there's the
mature vegetation, it's residential, not commercial, it's quiet.
The committee report calls it a heritage oasis, called the sack that time forgot.
It has that kind of feeling to it.
That condition is fortuitous, but that doesn't mean it's any less interesting.
It is relevant though that the setting has changed very materially over a long period
of time, as I've already explained.
So then the question really is what the site contributes to that experience.
you see the site from back garden.
By the way, these photographs, some of which are made from private land,
are from estate agents websites which I've reproduced.
Because they're a really good way to get a feeling for the way
these things are depicted and felt and experienced.
I know estate agents are doing a certain thing, but you know, in fairness.
And you see that it does feature in some of the views, obviously.
So I mean, I think, I'll come to the last slide in a minute.
The site is clearly a component that contributes to that experience of seclusion because it reinforces spatial enclosure.
But I have to stress, it's a really urban feature, and so it does really contrast with that.
It's been described as an almost rural feel that the area has, which I wouldn't disagree with, actually.
And the scale of it at the moment, and having entered from the Myland Road,
I mean, of course you know that's what that building relates to.
You're in a little cul -de -sac, that's just set back from the Mile End Road.
It's got the busyness of that at the west end and it's got this big building.
You access off the Mile End Road at the east end.
Just one observation you will have noticed.
I think when you first enter the close, you're not really aware of it,
because the angle of Bellevue Place changes slightly and you become more aware of it.
And certainly, so its impact and impression is,
it's like a direct view on a planned access,
if I can say that.
And so I think the difference between the parties here
is really, I think, simply expressed
if I go on to the next slide.
And I'll just say what I think.
So, I mean, I think that the lack
of architectural embellishment
and the way the wall comes down on the listed wall,
which is one in that image, is really quite harsh.
And I think that the lack of quality and relief
in the construction likewise is
actually distracting and harmful
in that context. I completely accept, because we've heard
witnesses of fact say how much they feel. I'm not denying that
and you'll form your own judgement about it, but I'm looking at it from a
an architectural historical perspective, it's quite clear it's a modern later intervention,
you can't think otherwise. So I think it's not unreasonable from an expert perspective
to see some of it as harmful to the significance, even at the same time. This is the curious
part of this case, it contributes something positive by way of seclusion. So that goes
back to this point about it's worth debating, obviously.
So I just then will rifle through,
because we'll see these again as a reminder.
I'm not going to talk about every one,
but what I'm going to do is just show the views,
which you've seen already,
and I'll return to these in due course.
So that was the full view set.
And by the way, I'll say that views were picked to create,
with using View City in discussion with the council,
to identify areas of maximum impact, potential impact.
And there's the frontage as it is now.
I'll say a few things briefly about scheme design.
This is one of the slides that's been put out of order.
It was before the place divider, and I'm sorry for that.
So I've just moved it from there to there.
And you've seen it already.
So just as a reminder about what the scheme had to do,
which is complex, it's not an easy site to develop at all
from a design perspective.
And you know, it's a famous modernist axiom, the plan is the generator, right?
I mean, there really aren't too many ways to develop a long thin site with only one access.
Everything has to come in off the street.
And a big part of the early design work was trying to get the distinction between the cinema users and the students right.
And to get the deliveries in.
Because both users have to be served. It's not easy.
And this was the scheme that was come up with.
I don't think there's any objection from highways or in functional grounds.
And the architects spent a lot of time doing it.
And the purpose of it really in the end was to create an almost double height entry cinema lobby.
It's ground plus is an open mezzanine.
So that the main part of the façade with that sort of stylish curving faience treatment
relates entirely to your experience of entering the cinema.
And that was a big change in the design development,
because previously we'd had some windows
and we tried to work them in.
After the design southeast, we just removed the windows.
Then the other reason I say that the site designs itself
is that, I mean, clearly, to optimise use of the site,
you're gonna need two cores, and they have to be separated.
And so the location of the cores is fundamental
to any design layout.
And the other big driver was actually to push the building away from Bellevue Place as far
as could be managed while still getting a functional arrangement.
And the setback you see to the east of Bellevue Place in the front is about 14 metres and
likewise the same distance from the other side.
And of course we do bring the gable right to Bellevue Place because if you didn't you
you couldn't make efficient use of that second core
that you needed to put in.
And diagrammatically in section is the top,
with back of house, and then actually a fire exit
for the cinema at the back, which is a single sort
of structure, which you will have noticed.
And effectively the building then breaks
down into three elements, each of which is intended to respond
to its particular context.
So A, B, and C, which you see diagrammatically
in front of you. A slide from the DAS just to give you an impression. That ground floor
drawing, Sarah, I think is one of the plants submitted for approval that you're looking
at. A page from the DAS. Now there's criticism, and I think in the Council's evidence that
The basic form and massing of the building hasn't evolved enough to demonstrate design optimization.
I have to say I disagree. It's true the basic form of the building is the same,
but there were a lot of refinements to the design.
Oh, sorry, sorry, yeah.
Oh, that's, yeah.
Yeah, no, I think it is worth studying that plan.
The, obviously, the, so notwithstanding we have this,
I mean slightly cross shaped, not quite, development
and it has a massing that's low and it goes up.
There were significant changes.
And the changes were all driven
by specific visual impacts from local areas.
And at each level, turn of the wheel, I mean there were a lot of options worked through here.
We worked interactively with the architects on a three dimensional model and looked at various options of materials and modules and came up, the architects came up with this response.
So if I had to summarise it, the principle materials, faience, stock brick, red brick, define each one of the blocks, A, B, and C respectively.
But the idea of the sort of ribbed faience was a detail we wanted to put in to give some unity to the scheme.
And bearing in mind early in the process, as I said earlier, we struggled with the idea of a single building,
with a single character or a broken up building.
So I'm afraid I really don't agree, or I would say disagree strongly with the fact or the allegation that we haven't responded to context.
I think we have.
Authority might think it's not successful,
but as a matter of fact,
every bit of the design was formulated in relation to context
and carefully over about a two -year design period.
And that's left us with the present building
you see from the north,
rather, section from the south,
which shows the interaction with Bellevue Place.
I don't need to say too much about these,
just to draw your attention to them in the pack.
I think an important slide for two reasons.
The existing buildings on the site or building
goes from low at the front to larger at the back.
Well, what we're proposing does the same thing.
So, in effect, it's an evolution of what's there at the moment.
But critically, the design of Block A, the green faience,
was in the design process extended far into the site.
That's about 25 metres back from the frontage.
specifically to create what the design review panel called a real,
effectively like a flashy cinema destination.
And I think it's very effective and I think the council agree that it's an enhancement
and demonstrates high quality design.
Here's Bellevue Place.
In true elevation, it just allows me to make the point obviously that
the setbacks there are 14 metres and it doesn't show the retained wall.
I make one point about this elevation that
you probably judge from the little key plan that to the northwest of the site the mass is pulled back from Coopers Close quite significantly.
And the taller elements you see in the centre on the left or east of that, the separating distances of the Coopers Close buildings are about 20 or 30 metres.
So there's quite a generous space that they face.
and specifically on the red brick.
Part of that was the tie -in with the red brick of Cooper's clothes,
which is I think probably its defining characteristic,
is that very typical mid -80s brick.
And just a couple of slides from my evidence,
which were prepared specially for the inquiry,
just to give a sense for what the aspired -for quality of the building,
which had to do a difficult thing,
because only part of it is used for the cinema,
but we wanted the whole building to say cinema.
And I think it does that very successfully, actually.
And then other elements which show you
the way the materials come together and are repeated,
such as the filleted or grooved faience,
and the use of two different kinds of brick,
and the way in which recesses and changes in materials
have been used to break down the mess of the building
from very specific viewpoints.
So we come on to then impact and effect and I'll kind of, again this is where I muddle up some things but I'll try to be clear what I mean.
Can I just cheque one thing Dr. Mealy before you go on? Just because of orders of slides and so on.
When you come to deal in a moment with heritage in Bellevue place, you're going to deal with the wall?
Yes I will. Absolutely, thank you.
Yes, and I, sorry, I'll refer you to one of my appendices
at that point, and I think you may have that open.
So, as I said, just for convenience, I've muddled the two up.
But I think it sort of needs no, very little comment now.
I mean, local authority agree that this is an enhancement.
And I think, I'm inviting you to give significant weight
to that enhancement, because the Mile End Road,
as I've described, is the principal historic artery in the area.
And it's where you appreciate the historic interests I've described most.
You see all the phases of development brought together and there's the road itself.
And so I think there's a significant enhancement and for me that attracts a significant weight as a consequence.
And part of that benefit is not just the quality of the building but continuity of the character of the use and the use together, the two of them together.
and I don't think there's any criticism.
You see here also, sir, the way the northern parts of the front building, A,
enable, you kind of create a, almost like a pavilion effect on the side,
which is what was intended, and at night, when you're thinking about the cinema,
you won't really see too much internal illumination from the students,
and what you'll notice is the lighting, the marquee, and so on.
In terms of townscape, just taking a simple point,
I mean the scale of the Mile End Road is very significant,
it's got a varied character.
The townscape feature that attracts your attention
is the Wickham's Department Store tower and the building itself.
And I think, sir, in that context, which is so varied,
and where you're seeing buildings of different scales,
I just don't think this has any impact on the character
or appearance of the area from this location or indeed the other locations I'll come to.
From a heritage perspective, I think the principal consideration here is whether the building undermines
or distracts from our ability to appreciate the historic and architectural interest of the department store,
because that's a principal heritage feature in the view.
And so the characteristics I suggest are its central emphasis from the tower.
The symmetry is disrupted because it wasn't entirely completed, but you recognise the
symmetry and I think the degree of change is so minor and the setback means that I'm
very surprised that that would make you appreciate the skyline profile of that building less.
And as to the encroachment above the parapet,
well, I think you do read that façade as a whole,
and it's designed sort of in the model of Selfridges in part,
of a monumental classical façade in the Beaux -Arts style,
steel framed. It's a really grand gesture.
And I think that the impact we're talking about is,
in my view, does not detract from your appreciation of those architectural
characteristics or its function. And a note, sir, that here we deliberately used a light
colour faience with the intention of trying to blend with the sky dome, so that it was
recessive as the word is sometimes used. So I don't think any heritage or townscape harm.
The view from Stepney Green, which is looking north through the conservation area. There
are listed buildings, sir, on the left in the middle ground, and in this view just to
you're right, a collection of very fine listed Georgian buildings facing the green.
As I said, in the conservation area, there's some modern development too, including the
one on the corner.
It's relatively quiet, but you know as you move along here you're getting to Myland
Road.
I mean, the open condition of the site at the moment is rather strange, I think.
I mean, I understand what they try to do with the screen, but it's better than seeing a
car park.
And from this position, I think it's a view from a historic part of the conservation area
out towards the modern road.
And in relative scale terms, I don't think there's a significant skyline change from this position.
The building in the left foreground is a five-, six -storey building.
We're a six-, seven -storey building.
You know, it's not, it's about a six -metre difference.
It's not massively taller, and I don't think it affects a significant skyline change.
From this position, really what you see of the listed building is the rendered gabled end,
which you weren't intended to see, obviously.
We picked this position again so you could see the most of the building.
And then we moved to the side of the street
because when you got to the corner you couldn't really see much of the listed building.
And this is about the point where I think
if you want to understand the architectural interest of the building
it begins to appreciate the terrace, I mean.
So from this point you can begin to understand its proportions,
its materials, its character.
And at this point, yes, there is an over -topping.
But the point I'm making my evidence is
this is part of a moving view.
And part of that experience means
the effect of motion parallax.
So you understand setting depth in a real scene.
And I think the use of light materials
I think avoid overbearing on the skyline.
But I think critically also the elevation of the building,
of the listed building, is the thing that holds your attention.
because that's where the interest is, in my judgement.
Because part of what you see of the listed building here is the gable end, which is not attractive.
And it's really when you get nearer to the listed building that you begin to understand fully all of its architectural characteristics,
as they're described here in written evidence.
It's an estate agent's view from across the road, which is clearly selected to emphasise the trees and so forth.
But in the winter you get a good elevation view of it.
So I think by the time you get to this point, which is I suppose the maximum reveal of its value,
I mean the scheme is completely out of sight and I don't think has any influence on your experience of the building.
I think if there is a degree of harm, it's a matter of judgement from the previous view.
I mean your experience of this building is largely unchanged, so the harm I think proportionally would have to be relatively small.
But it's a point of fine judgement.
I think, come to Bellevue Place again, just an elevational drawing from the DAS with some
photographs you've seen already that just illustrate how the elevation of the building
was treated with bringing a gable end to the gable end of the list of terrace and then
setting the façades to either side back. So that was the basic concept. And this, at
this point showed retaining only wall A, which was, in my judgement, the original wall to
the terrace. Just a slide to show the way the scheme evolved to deal with considerations
of heritage setting, but also principally as well, amenity. There are separate matters,
but they overlap to some extent here. So there was a design evolution specifically to try
to address the point and to reduce both actual overlooking and the perception of overlooking,
which I suppose tie in with the heritage in that idea of seclusion and so forth.
And coming close, now this, I'll just pause here to talk about the wall.
So the lower part of the wall, which is stock brick with a stone, I think stone coping,
It's probably about 1 .9, getting on for 2 metres tall, something like that.
Very traditional boundary wall.
It must be listed, because it's attached to the listed building, appears to be the same date.
The rendered bit above, which you see in this image is retained as the grey, will be later.
I don't know when.
It could be the cinema building that's been rendered.
It could be some remnant of an earlier building. I don't know.
Now that wall at this point, as retained, is about four metres, and in the rear garden,
which is about midway through the first floor, in terms of elevation, it's quite substantial,
actually, and in itself, I think, reinforces the sense of, there are other things too,
but it's one of the features that I think retains that sense of separation and seclusion.
And that's true as well on the rear elevations, or the rear gardens, I don't talk about their
more amenity points, and also the terrace is quite varied at the back, so its historic
interest has been changed over time.
And you've heard already the points, but just to make it clear, for the lowest part of the
development nearest, we thought it was appropriate to have a stock brick wall with flat punched
openings that were filled, to recess then further the very top and to use this light
coloured clouding, which we thought was visually recessive,
and then to deal with the amenity point
to have the angled windows.
I would completely take the point that that feature,
that diagonal feature, is not a neutral feature, I guess,
but we were faced with the choice
between respecting the sense of privacy,
bearing in mind it's a place you could just walk up
to people's front doors,
which was a particular sensitivity local authority.
and early on we did have a scheme which had flat elevation,
but those are introduced specifically to deal with overlooking issues which are treated by others.
So, just to summarise from a heritage perspective,
I think retention of the wall to the heights I've discussed
does preserve that sense of difference and seclusion to some extent.
There are the setbacks which I think actually clarify the extent of the wall and the end of the historical terrace,
and I think the setbacks are more respectful than the existing building in the sense that they're not built right hard up against it.
There's I think an increase in the legibility of the terrace even as we're increasing the volume of material.
The materials are clearly complementary.
As I said, there's blank facades and no direct overlooking.
And I actually think it's, let's put it this way, bearing in mind
that there are some positive qualities with the existing wall
and some negative ones, on my evidence,
we do increase the scale here,
but I think it's a more respectful treatment.
Now, I'm approaching that as a historic buildings expert,
and I understand people in the room will disagree with that.
And I hope they appreciate why.
But if we go back to the four characteristics about setting, or the characteristics I started with,
the experience of entering from off the road through the gate is just not changed.
The intimate quality of the buildings and their interaction with the mature landscaping is not changed.
The wall to the north is not changed.
There really won't be too much perceptible change until you get about midway along the terrace.
And then there will be a further change.
Now, what's shown in the image there is not the front of a building.
In much the same way you're looking at the side of a building here, you're clearly looking at the side of a building here too.
And in both cases, I think anyone coming to the site will know it's a building that fronts the Mile End Road.
So in terms of meaning and understanding, I don't think the situation changed.
A big building that you access from the Myland Road is replaced by another big building you access from the Myland Road.
On my evidence, it's a design improvement.
It's a judgement that I accept as finally balanced, and in evidence I entertain, one might form a different judgement.
Mr. Parker's image from his presentation, no criticism but to make the obvious point
that what that line of the parapet shows in red is the existing parapet and that the ranges
are set back.
Looked at in those terms, actually the ranges on the left is only a marginal increase in
height and the main increase in height is in the gable.
And I think just concluding very shortly with a few slides,
just for completeness, to show how the two parts,
buildings B and C, are separately expressed.
And from Cooper's close, the slide, I think,
one of the reasons we wanted to change materials
in that western range was actually to emphasise the recess
back from the existing building line, so you have greater depth,
And then the windows obviously facing in this direction
don't I don't think present any issues around privacy or overlooking.
But you do move from a building which is back of house in its character
and is slightly inappropriate in a residential setting, I would say,
from a townscape perspective, to a building that's clearly inhabited by people.
So the change to character I think is complementary and not harmful.
There is an increase in height scale bulk mass but I think in the context it's not sensitive.
And if you have to optimise the site, this is the place where you should do it really.
This and on the anchor retail park side. And I think that's it. Thank you very much.
Okay, I've just got a couple of wind up questions please before you leave the stand.
We have a short break or whatever and you go across the room for cross -examination.
Bearing all of that in mind, could we just summarise for the inspectors benefit, whether you, in respect of the three designated assets, groups of assets, and then the non -designated, whether you say there would be harm and how much in each case, just now that you've heard the council's evidence on that.
So in summary, so we'll start with the NDHA.
Yeah, do that first.
Obviously, there's substantial harm to its interest
because it's being removed.
But as with any heritage or environmental assessment,
you have to look at the nature and extent of that harm.
So what is the importance of the asset?
And I think that enables you to put weight to the harm
in the balance, which we have to do.
And I just ask you to bear in mind a few points.
First of all, it's altered.
Second, it's a late example of its type.
Third, at least on my evidence,
it has some interesting features.
Just that last point, why is a late example
of that type a negative?
I'm sorry?
Why is a late example of that type a negative?
Oh, right, okay, so thank you.
So one of the considerations in heritage assessment
is rarity, so just to take a simple point,
the first great cinema designed by William Glenn
for ABC Cinemas would be pretty interesting historically.
The 73rd one he designed for ABC Cinemas is less
so because he's just working through a formula
and it's the end of a sequence.
So an early Georgian house
on that analysis is more interesting than a later one.
And I think that's because additionally there's nothing
in the ornament or design of the building which is unusual apart
apart from the fact that it had to deal with an odd site,
and I say the response is expedient.
And then I think continuing the point, sir, before your question,
I was going to add that architecturally, you know,
its interest is, I'm sorry I didn't say modest, I agree,
and those elevations to the sides and back
have no heritage value in my judgement.
I think you have to be really clear about these things.
It might be easy to say some because it's obviously an old cinema,
but I mean really looked at, I think critically.
I don't see that many value.
As for the other assets, I see a significant enhancement
to the conservation area arising principally
from the frontage building, and I'm inviting you to give that significant way.
I see no harm to the ability to experience the significance of 107 to 113 Myland Road,
second asset, and likewise I identify no harm to the Bellevue Place terraces.
And that would of course include the fact that they're in the conservation area.
I didn't quite catch just the last sentence.
Oh yeah, that no harm finding on the terraces in Bellevue Place would include the fact that
they're in the conservation area, so I'm finding no harm from that to the conservation area,
which I think is implicit in what I said originally.
So what I'm not doing, sir, is I think netting off the harm as between Bellevue Place and
Island Road, if that makes sense, which you could do on a Section 72 basis, obviously.
Yeah, I think you've just covered the point I was going to ask.
Thank you.
I don't have anything else for you, Dr. Meen, I think we're there.
Thank you very much.
So that's all in chief.
Thank you, Dr. Meaney.
Ms. Booty Smith, would you rather have a short break now or start course examination and
then have a break in about 20 minutes?
Probably prefer to have a short break now if that's okay, sir, but I'm in your hands
really.
I'm happy to do that if everyone else is.
Okay, what is 10 .36?
Should we come back at 10 .50 then, if that's okay?
Okay Dr. Mee, you're in isolation.
Okay, thank you. I say the inquiry is adjourned. Thank you
The inquiry is regimes, let's be Smith
Thank you, sir, if it would help dr. Mila, I will be taking you to your proof the HDVIA
step me green conservation area appraisal
heritage unions consultation response and
and potentially some local plan policies, so it may be useful just to at least have the first four documents.
Sorry, could I ask, did you say the Historic England...
Your proof, your appendices to that proof I should add, HTVIA, so core document 7 .8,
the conservation area appraisal, 11 .3, and Historic England's conservation response.
If I could ask you to turn first into your proof at page 19, paragraph 4 .21 -23.
I just want to pick up a point that you raised in your errata sheet that you circulated yesterday.
So as I understand it, your errata sheet confirms that contrary to what you say at 4 .23, the
policy as a whole is consistent with NPPF heritage policy HE65, is that correct?
That's my correction, yes.
That's your correction.
Just in relation to, there's a number of points that you make at the paragraph 4 .21 to 4 .23
and you begin by saying in relation to 4 .21, this is a second sentence, you say that LIM1
of the local plan policy also fails to distinguish between designated and non -designated heritage
assets blurring an important distinction in national policy.
Do you continue to maintain that LIM1 is inconsistent with the MPPF for that purpose?
It relates to SDH3 -1.
Let me just reread it.
So what's the CD number for that policy?
Sorry, the SDH1 is CD, sorry, CD10 .1D is SDH3.
It doesn't distinguish between designated and the different levels of protection according
to each.
No, but that's correct.
But are you saying that's inconsistent with the MBBF?
Oh, I see.
Probably not in terms because one of the general, I think the first NPPF policy, HE, does talk
about the two together in the same paragraph.
Exactly.
Maybe if we could just draw that up.
So CD11 .1 is the NPPF if we're working on CD numbers and if you go to HE4 of that, of
the MPPF which is on page 94 using the internal pagination.
Starting at HE4 you see that they are talking about heritage assets generally and if you
scroll down to HE5 again it's heritage assets generally and then we have separations out
in terms of HE6 where we are talking about designated heritage assets and similarly there
is a separate heading for non -designated heritage assets.
Yes, I think that's a fair point because the policy in the local plan goes on to draw a distinction in other limbs
It does indeed so you accept then as well just just to clarify because I know you made the clarification in relation to 4 .23
But you also agree that there is no
conflict with the MPPF
That's right. I agree. STH 3 is broadly in conformity with the
So just finally, you agree then that there's no justification for giving any of the local
plan policies on heritage less weight?
Not in the local plan, that's right.
No, okay.
Thank you.
In the London plan, however, there is clearly no balancing provision.
I didn't catch that, sorry.
So could you repeat that, Dr Meeraj?
I believe in the London plan there is no balancing provision in HC1.
We're not talking about the London plan at the moment, we're talking about the local plan.
Or the Tower Hamlets local plan.
So turning to the proposals now, since we're just, if you still have the NPPF open,
actually just be helpful if you could turn up HE6 -2.
This says that development proposals which would have a positive effect on a designated heritage asset should be supported.
You agreed, the question is whether the development proposal as a whole has a positive effect on a designated heritage asset.
So the question is not whether a part of it has a positive effect, you need to look at the proposal in the round.
That's correct and netting, if there are any negatives, taking him in the round with positives.
So that you get, that was the point of the net judgement I referred to in chief.
And just again, just going, just touching back to your initial appraisal, so we can look back at, in your proof, if you have a paragraph 2 .17
and you touched on this in the evidence in chief.
You mentioned how you were approached in early 2023 and that the first stage was this baseline
assessment of the heritage and townscape sensitivities.
And you said as part of that you identified that the building has a degree of architectural
and historic interest, warranting consideration behind decision making process, and you explained
that the NDHA, that it was a non -designated heritage asset, and that you thought it made
a positive contribution to the character and appearance of the conservation area.
At paragraph 2 .26 he said accordingly the proposals remove all the architectural and
historic interest of the non -designated heritage asset.
Just to confirm, you used the term substantial harm but using the new MPPF criteria would it be total loss of the heritage asset?
Yes.
Yes.
Just in terms of just staying on that point where you said it makes a positive contribution
to the conservation area, do you accept therefore that if you have a building that makes a positive
contribution to the conservation area, the loss of the total loss of that building would
cause harm to the conservation area?
Yes, that's what I say in my evidence.
Just confirming, but in order to take into account then any, the overall harm to the
conservation area, you must look at the impact both arising from the loss of that building
and also, and I think we are agreed on this, but I just want to confirm that you are taking
account the loss of the building and the impact of any replacement building, whether that
is harmful or in your view I understand it to be a positive contribution, you have to
take into account both elements.
But always looking at the end state.
Always looking at the end state, the completed development.
Looking at the proposal as a whole, yes, but you need to take into account the harm, you
must also identify that the harm arising from a loss of a positive contributor.
Correct?
That's correct, yes.
Okay.
In order to come to a balanced judgement.
In order to come to a balanced judgement, true.
Okay, so before we go into the heritage assets themselves, what I want to do is I want to
discuss the options analysis that you touched on in your evidence in chief.
I just want to start with a statement you make about this evidence, about the options
appraisal at paragraph 5 .52 of your proof.
It would maybe help just to draw that up if you can.
Just on page 27 if you're using page numbers.
What you say there is that accordingly having reviewed this, as I understand it, this refers
to your work on the options appraisal, comprehensive redevelopment and re -provision of the cinema
within a new building was considered to be the only viable means of securing the continued
cinema use of the site. Is that correct? That relates to your findings on the options analysis.
That was the findings, yes.
And you explained at paragraph 230, and you also explained in evidence, how inputs to
this options analysis included inputs from architects, engineers and a viability specialist.
And so when you say only viable means, you're referring to what's known as policy viability,
that is like the conclusion of a viability expert.
That's correct, that's what the Porter economics analysis was.
Just make sure that's what you say, you say that's what the Porter economics analysis
showed?
Yes, it's an appendix to the options analysis.
We'll come to that in a moment, but just saying I just want to hear what your answer was,
you said and that's what the Port Economics analysis shows.
Yes, which I believe was accepted by the Council.
And if we can draw that up, why don't we go straight there actually.
So if we go to CD 7 .8.
Thank you.
And we can start by, if you have it to hand, then if we could start by looking at just
one for five, which of these, this is your first option in your options analysis, so
Do you have the end of your option conclusion not economically viable?
Do you see that at the bottom?
It's just on the...
You'll have to give me an internal page reference.
22 of the options analysis.
Thank you.
Page 145 of the PDF.
Can you give me a paragraph number?
I'm sorry, but I'm not...
There is no paragraph number.
Oh, I'm sorry.
Thank you.
Yes, that's right. This was one of a series of tables filled in by the whole of the team.
Yes, and this conclusion, not economically viable, comes from the table, and I think
this is what you were referring to in the Port Economics report, which is, as you said,
to it for the inspectors benefit is on page 183 of the PDF but for you Dr. Miele
I'm looking at the table on the internal pagination of that document on
page 14 but this is within the Porter economics report which you
get to is at appendix one
As I understand it, when the conclusion that it wasn't economically viable comes from the
fact that all these, you know, that third column across, we've got negative results
here for Headroom.
So, turning back to what the options analysis assessed, you identified, as you said, five
main options, a number of variations to those options, and they are, if you have that table
in front of you, you can see the summary of those there.
But none of those options included
the comprehensive redevelopment of the site
incorporating a replacement cinema, did they?
Sorry, each of the options that were drawn
had a cinema use in them.
No, just the question was none of those options
included the comprehensive redevelopment of the site
incorporating a replacement cinema.
Did they?
Sorry, does that mean similar to the scheme we're now considering?
Yes.
I'd have to cheque, but I think that's right.
I don't think the base scheme was assessed.
That is to say the scheme that's now in front of the inquiry.
Sorry, when you say base scheme you don't...
No, I mean the scheme that's in front of the inquiry.
Scheme in front of the inquiry.
And we can go back to, if you want, if it's helpful to look at the text rather than that table, 139 of CD 7 .8.
So this is page 6 of your options analysis where you set out the rationale for alternative options.
Internal pagination 16, do you have that?
You agree that you have all the options on the right -hand side, this you present in your
presentation but again none of those options are the scheme being assessed.
Sorry, just to kind of finish the question, they are not the scheme that is being assessed
but none of them involve the demolition of the existing building and redevelopment.
Yes, that is correct because the purpose of the options analysis was to test retention
of both the building and a use that met the local plan objectives for land use.
Okay, we'll come on to that.
So, none included the redevelopment, including the demolition, and you said that was because
purpose was to test retention.
The purpose was to test whether or not the existing building as a whole or given adaptations
could be reused for uses that would meet the aspirations of the local plan as they were
described to us, as I understood them and described to us by the council.
And you're right, yes, the scheme that is in A scheme, similar to that in front of the
inquiry, was not part of that.
So your options analysis does not demonstrate that the comprehensive redevelopment, including
the demolition of the cinema, is a viable means of securing the continued cinema use?
No, that's fair.
No, and it does not test, because it does not test that, it cannot show that the comprehensive
redevelopment of the site, including the cinema use, is the only viable means of securing
the continued cinema use of the site.
You'd accept that, don't you, Dr. Miele?
I don't accept that, because the current scheme is subject to a different viability analysis.
I wasn't going to ask you about viability for this scheme, I was going to save my questions for Mr Brown, unless you want me to ask you about it.
I think that he would be the most appropriate person to discuss viability with, but just to confirm, you accepted that the options analysis does not demonstrate that the redevelopment is a viable means of securing the continued site.
and it follows therefore, it cannot demonstrate that it is the only viable means,
your options analysis cannot demonstrate that the redevelopment is the only viable means of securing the continued cinema use.
That must be right.
That must be right.
Yeah.
Well that wasn't its purpose. Its purpose was to test retention.
You say the purpose was to test retention.
I want to come on to this point in particular.
Just turning back to your proof, just so we know the starting point of what you say,
again just going to what you say the options analysis does.
So if you have your proof open so page 20 at 4 .3 and 4 .4.
This is where you say 4 .3 you refer to policy and HE9 and you say that HE9 requires you
to retain and conserve buildings which make a positive contribution to the character and
appearance of conservation area where possible and you say the options analysis demonstrates
this is not possible.
Yes.
That's your position.
But if we go back to the options analysis and we look at,
and you should have it open, it was the last page,
so page 139, this is the rationale
for alternative options again, page 139.
And I want to look at paragraph 4 .1.
Contrary to what you've just said now about this being
to test retention, what it says it does is
that the options analysis, so we're just going to find the precise paragraph, the second
sentence it says in response to the council's pre -application meeting an exhaustive analysis
of alternative options to redevelop the site whilst maintaining a cinema use have been
considered. That's what it says, the purpose of the options analysis. Do you agree, just
Do you agree that that is what the options analysis is setting out to do?
For that sentence?
No. I mean I think that that's, it's quite clear from your reading of the whole of the options analysis
that it's in the context of retaining the building.
And that's the out turn of the options analysis.
But that's not what the options analysis itself says that it's doing, is it?
So we look at that paragraph, it says it's...
Well, sorry, no, no, that paragraph could have been clearer, I accept, but if you look
at the whole of the document, that's clear. What I've just said is what it sets out to
test whilst retaining the building. That was the purpose of the analysis.
Where does it say that in the document?
Well, it says this earlier in the document when we talk about the policy context for
heritage, which is SDH 36.
I want to ask you what the options analysis, not the policy, but I'm saying this options
analysis, we agree that what the options analysis says it did, and I'm just going to take it
to two points.
We've got this statement saying that what it was seeking to do was to analyse alternative
options while maintaining the cinema use.
So if we could just look at 4 .11,
and it says the options of that same document,
sorry, 4 .11, it's on the same page.
So we were looking at 4 .1 of the,
page 16, and 4 .11, it says the options as assessed
are listed below, and we have retention
and full refurbishment of the existing cinema as option one,
including, we've got the details,
option two is also the retention and full refurbishment
of the existing cinema. Option three is retention and full refurbishment of the existing cinema,
again with screen one adapted. Option four, so if you just skip down because I'm just skipping
through the variants, but I understand that there are variants, but there are variants on the
retention and full refurbishment. Option four again is retention and full refurbishment of
the existing cinema, that's four a, b and c also involve that. Five a and b involve the part
retention and part demolition of the existing building, but all of your four options relate
to the retention and full refurbishment of the cinema, so we're looking at the use.
Do you agree with that?
The first four options are retention and full refurbishment of the cinema use?
With some other uses.
With some other uses, yeah.
all premise as I've explained in my chief and in answer on the basis of retaining the building.
That's not...
Sorry, that plainly is the case if you read the document.
The document doesn't set out... Sorry, let me finish.
The document does not set out to assess the proposal that's before this inquiry.
That wasn't its purpose and that's clear if you look at the document as a whole.
We're talking about just a slightly different point.
I can put the question again.
We established that you haven't tested, even through it, you haven't tested whether the
option that you're carrying out is a viable turn of option, as in the current scheme before
you.
It doesn't say that, you've agreed with that.
Now we're looking at what the purpose of the analysis was and what the stated purpose of
the document, is that it's seeking options to redevelop the site whilst maintaining a
cinema use and you've agreed that options one to four all relate to the retention and
full refurbishment of the cinema and options five contains the rebuilding, so if we look
at options five A and B or option five, you have after the part retention, part demolition
of the existing building, the cinema to be rebuilt to retain four of the five screens
and you've got the new PBSA and that's the same with option five.
But what it's not doing, what this options appraisal is not doing,
is exploring other potential uses of the existing building.
Oh yes, no that's absolutely right as a whole.
But just to be clear, sorry, if I can, I'll conclude my answer please.
Just to be clear for your notes there, paragraph 1 .17,
the introduction to this document expressly references Policy HD3,
And, Lim 6, which requires or imposes a presumption against the demolition, sorry, 1 .19, presumption
in favour of the retention of unlisted buildings and make a positive contribution to the character
and appearance of the conservation area. That is the purpose of the document as set out
in the introduction. The terms of reference for that testing were the policy requirements
which Mr Rowe can address, for retention or enhancement of community facilities.
And so this was a heritage demolition testing study. That was the sole purpose of it. It
was not ever intended to test a scheme like the current scheme in comparison with the
others, and we were not requested ever to test alternative uses with a cinema.
So my next question is that you explained that it wasn't exploring other potential uses
of the building, you said no, and you accept therefore that there may plausibly be other
options or other uses of the building, we're talking about the building, that could be
viable.
Yeah, that's just a rule, yes it says that.
So where's that citation, sorry?
No that's a question, I just asked you a question.
No, no, sorry, can you rephrase the question, I thought you were reading to me from a document,
Sorry, can you re -save the question?
I asked you that there may plausibly be other options or other uses of the existing building
that could be viable.
Oh, as a proposition.
As a proposition.
Sorry, I'm being about to, yeah, I mean I can't see any.
I'm not a liability expert, but I've been working in this area for a very long time.
You didn't.
And sorry, can I finish the answer, please?
Yes, you may.
Yeah, thank you.
I explained some of the physical characteristics of this building earlier, sir.
It's a steel frame building with steel structures supporting the internal elements.
It's not a masonry bearing building.
It's designed for a very specific purpose, a cinema, like a theatre, to do one thing.
It has a depth of plan, which means you can't adapt it really in any practical way for office
development.
It has no windows.
Any other form of development needs windows.
It's an impossible proposition and the evidence of that is up and down the country in cinemas which are derelict or where they're retained.
Only the frontage elements are retained as part of modern residential and office developments which you see all over the country.
We were never requested to do it and I think it would have been an unreasonable request on the facts of this case.
I'm just picking up on that, you said that it's a cinema and it's like a theatre
and therefore it can't be changed into other uses such as offices and other residential uses, do you agree with that?
You didn't test whether it could be used as a theatre, did you?
I mean that's a far -fetched suggestion.
No, I'm sorry, no we didn't, and for the same reason.
For the same reason.
Far -fetched.
Because cinema's theatres are very intensive forms of building use.
You'd have to remake this. Where is the operator for that?
I just think that's a far -fetched solution.
The question is you didn't test it.
It's more analogous, sorry, cinema is more analogous to a theatre than an office,
so it might be capable of doing that, but you know.
You didn't test it, no.
No, because it seemed unreasonable and we weren't requested to.
That's not set out, it's not in your options appraisal that you consider that would be an unreasonable...
No, because any options appraisal like this, you have to take a reasonable basis, a reasonable view of the likely options to test.
And you take that decision in discussion with the council, and it was the council that made a suggestion, as I said in chief,
to test events venues and things relating to the universities nearby.
The council never asked us to test any other use.
You didn't test whether it could be used as a nightclub, did you?
Actually there is one of the options.
It has a sort of nightclub or casino use which would be similar to a nightclub.
But whether the whole building could be converted or used as a nightclub, did you?
No, we didn't look at a nightclub, no, because that wasn't the same as having a cinema and
that was the object on the land use side because the council was very keen to retain the Genesis
cinema on site as a well -loved community asset.
True, but just from a heritage perspective, I could just pause there, would you accept
that from a heritage perspective, keeping the existing building on site but with an
alternative use such as another entertainment use would be better than demolishing the,
in heritage terms, the total loss of the heritage asset.
So just to clarify that, in terms of the effect on the non -designated heritage asset, do you
accept that using that non -designated heritage asset for another entertainment use would
be better than the total loss of the non -designated heritage asset?
Well no, because I don't think that the building is capable of that use.
I mean if the cinema could continue as it is at the moment in the existing building,
then we wouldn't be here.
Just so I understand that correctly, so you're saying in heritage terms the total loss of
the non -designated heritage asset is better than its retention with an alternative entertainment
use?
Okay, I understand.
Well look, I mean obviously it's an NDHA so you need to think about retaining it.
That's a fair point. But we were trying to work within the realm of what's possible and deliverable.
And the council didn't suggest any other community use and they're kind of thin on the ground.
So we were working with the council in the early stages of this.
But yes, finding a use for a heritage asset is better than demolishing it. That's a simple proposition being put in, of course that's true.
Could I just ask, have you had regard to the other evidence produced by the appellant in this part of this inquiry?
So the other witnesses?
I've read Mr Rock's evidence, I've read the summary of the viability evidence but I won't claim to have read it in detail now.
Okay, I just want to bring you to James Brown's proof of evidence, if I can, CD 3 .4.
I understand you haven't read this.
Just give me a moment, I've got to get it off the web.
So CD 3 .4 and I'll be looking at page 41.
I mean I'm not sure I can answer detailed questions on his evidence actually because
I haven't read it in detail and it's outside of my area so I'm not really sure I'm comfortable
answering those questions because they're being sprung at me now.
I'll wait till I hear what the nature of the question is.
Sure fair enough I'm happy to hear the question obviously.
Page 41.
CD
3 .4 page 41.
3 .4.
Page 41.
One minute.
Sorry.
Oh, there it is.
So I understand that this is not your evidence and I understand that you can't answer questions
on viability, but your viability consultant at 6 .5 .9 said that there was scope for...
Well I get the document if you don't mind.
659?
6 .5 .9 page 41.
Okay.
So the appellants evidence, albeit in a different context, is that there is scope for the existing
building to be used as, and there's a number of different options here, a mosque, a nightclub,
a casino, a conference centre, and indeed the existing building is occasionally used
for this purpose, a live music venue, university use, theatre, data server centre, Wetherspoon's
Type Cub or other?
I mean I don't know, I'd have to read the whole proof to understand the context for
that. I don't know what is meant by that. I mean spatially a building volume can accommodate
those, probably those uses, but I have no idea of, I have no idea, I mean I don't understand
whether they're deliverable, no idea whether there's a market for them.
So this is all outside my evidence.
So if the question, sir, is, I think, is the building big enough as a volume to accommodate
other uses, well, yes, that's obvious.
But that's not the, I don't think that's the issue.
So I just want to confirm that I've taken this down correctly.
You said you have no idea whether these would be viable and no idea whether there's a market
for them.
Yeah, I have not read Mr Brown's evidence in that level of detail.
That's fine.
That's all I want to take you to.
Just to come up with a piece, so you don't know because you haven't tested them, but
you have no idea whether they would be viable or not.
Well, no, and that's because this viability evidence is prepared for a different purpose
to the viability options analysis that was done on the preamp basis, which I've already
explained.
They're totally different animals.
We'll get all asked Mr. Brown about them, but I just wanted to cheque that you confirmed
that you had no idea whether they were viable and no idea whether there was more.
No, I can't insist the inspector.
That's fine.
Okay, so I just want to go back to your proof if we can.
Don't worry, I won't be asking you any questions on viability.
In terms of if you could go to page 38 of your proof, please
And I'll be looking at paragraph 7 .5 sorry 7 .5
You said you refer to the building as being a wasting asset
with no realistic prospect of being reused for the foreseeable future.
Which is my understanding of the case being put by the appellant.
Sorry, your understanding of the case being...
That's my understanding of the case, that there is no alternative for the building.
Right.
In its current form, which was the point of the options analysis.
Sorry, you said it's the appellant's case that there's no potential use of the building.
I can only refer to the work that was done on the heritage options earlier. I cannot
give evidence on the rest of the appellant's case.
True, so you accept that you've provided no evidence that there is no realistic prospect
of reuse of the building?
I thought that that was established through the options viability testing.
That is the study we've just referred to.
Okay, well we can make submissions on that because you have accepted that you have not
tested other potential options on reuse.
Well the important word is realistic.
Yes.
And you accept you only know if something's realistic if you test it.
Of course they can in theory, but there's little point in it.
Because one has to take a practical view of these things, you can test options infinitely.
What you rely on is the discussion with the council to establish the scope, which we did.
So in terms of turning to paragraph 8 .87 of your proof, you say, if the appeal is dismissed,
then the site will lie vacant and unless there is a new use for the site found, degrade the
setting of the listed buildings.
Sorry, 8 .87, page 50.
And this is your conclusion.
If the appeals are dismissed, the site will lie vacant, unless there is a new use for
the site found, it will degrade the setting of the listed buildings.
The site is not currently vacant, is it?
No, it's a future tense.
And it will only be vacant if the owner of the site chooses to let it become vacant,
isn't that correct?
Well, that is true, but there's evidence elsewhere about the continuation of the cinema, and
throughout the process we were talking to the cinema operator.
Well, the continuation of the cinema, which is a business, is different from vacancy of
a building.
Do you accept that?
Yes.
Yes.
Well yes, but a building becomes vacant because it can't be operated anymore.
Because? Because it can't be operated anymore.
And that was the results of the options of liability testing that we started with.
But you haven't provided any evidence that the site will become vacant if the appeal is dismissed?
No, I mean, no, that's fair. No, sir, that's a fair observation, which I accept.
It's a judgement based on the evidence that we have provided and experience, which I think is reasonable.
So I want to talk about the conservation area. As far as I understand in here I think there would be a bit more common ground.
This common ground that the Genesis makes a positive contribution to the character and appearance of the Stepney Green conservation area.
Yes.
Correct, that's your expert opinion, correct?
Yes.
And that's also the opinion of the council's experts?
Yes.
And it's also the opinion of Historic England in their consultation response.
And could we just turn up that consultation response please.
That's CD 5 .8.
At page 2 of that consultation response, if I could ask you to look at the third paragraph from the top.
Sorry, was you referring me to the paragraph at the top?
So, third paragraph from the top, that starts with the word surprisingly.
It says, surprisingly, the cinema is not identified in the conservation area appraisal as contributing
positively to its character.
Do you agree that this is the statutory consultee saying that this omission cannot be easily
explained?
Yes, that's the meaning of surprisingly.
And then the next two sentences, it says, although of modest and altered architectural
quality externally, and just pausing there I understand that you agree with that assessment
that it is of modest and altered architectural quality externally, so we agree there.
Yes, we agree.
It says although that, it says it makes a valuable contribution to the historic development
and social history of Marlin Road, and then it says we therefore consider.
So this is historic England arriving at its own conclusion having considered the architectural
quality contribution to the historic development and social history of Milan Road, correct?
Yeah, I agree with those last two sentences.
And just to make the point that in the first of those two it's obviously qualified and
it seems to me reading it, and I would agree with this, that it's that history of entertainment
use that I described in chief, that does make a particular contribution to the historic
development and social history of Myland Road. So in a sense it's not withstanding it's of
modest interest and architectural quality externally, it nevertheless for its historic
and social interest is making a contribution. So I think I agree entirely with that.
Okay, but you agree though just in terms of the approach, you agree that this is the inspector
should follow the same approach in that he should arrive at his own conclusion having regard to the facts
as in quality, contribution, whether it's social or history, rather than what is or is not said in the
Stepney Green conservation area appraisal.
Yes, I do agree that and obviously Inspector you could form an entirely different view to historic England
or to me or to everyone else. Nevertheless I do maintain it's relevant that it's omitted and it's also relevant
that it was never put on a local list and it was never suggested for that.
That doesn't mean to say it has no interest and I think the evidence is clear on that
point.
Because in any one of these cases there will be gradations of interest and there are different
ways of capturing and reflecting that.
You say it's relevant that it wasn't put on the local list so we can just maybe touch
on that briefly here.
You heard evidence from Miss Lambert yesterday that the Council's approach is that they do
not locally list buildings where they're in a conservation area.
That's not on their official guidance from 2016, which I checked. Their official guidance
doesn't say that. It's not a document before the inquiry, but I've read it. I can put it
before the inquiry. We can get it put before the inquiry.
I think you will need to now that you've said it, if you want to rely on that statement.
Let me just find it, because I might have mis -recollected. Hold on.
So just to confirm, the question is not whether you can locally list it, but the question
is did you hear Ms Lambert's evidence that the usual practise is not to locally list
buildings in a conservation area?
No, well it's not been my experience, she's the conservation officer. I'm just going from
the guidance. It's certainly, put it this way, in Camden they have a policy about the
local list, they will not put buildings and conservation areas on the local list. That's
not the case in this authority.
Okay, so I think...
So it is relevant.
I will need to see this guidance now, it's been talked about. I don't know how you want
to deal with it. Would you like to... There's going to be a break at some point, isn't there,
so you can probably read it at that point.
I'm not concerned, but I'm happy for you to see the guidance, sir. But I think we are
broadly agreed, Dr. Mealy, if we can, that there is, we agree there is no policy in Tower
Hamlets that, say, prevents or says that you should not locally list.
We agree that. Yeah, so there's no policy, and I think that's
what you're saying, the guidance document might not provide such a policy, so we agree
that as a matter of, you know, it's open, and I think we would both agree it was open
to London Borough of Tower Hamlets to locally list it.
We agree that, that's probably the simplest way through this.
Open to them to locally list it, but you heard from Miss Lambert, and I agree that you might not accept her evidence,
but we had evidence from Miss Lambert who's worked at the council since 1989,
that the practise, and she was not challenged on this, that the practise in Tower Hamlets is not to locally list buildings in a conservation area.
Well if that's the practise it's not set out on any guidance document.
No, and that's agreed, but you accept...
But I mean that's relevant, isn't it? Because if it's, you know, it's one thing for the council to behave in a certain way,
it's another thing for them to state something positively or otherwise.
But do you accept that if it is a practise, there is limited inference that you can draw from the fact that the building is not locally listed?
Well, I'm not inviting you to draw a huge amount from this. I'm just saying that it
was open to either the council or a third party to suggest it and they didn't. So it's
part of a series of factors that I think is relevant to your consideration of the relevant
merits of the building in a conservation area or other context.
So I want to go on to townscape and site context but just before I do, were you saying would
you like a break now or would you like me to continue to lunch?
I think, I'm very happy for you to see it but I think we're agreed in terms of it's
not part of the policy document but I'm very happy for you to see that.
So turning to the site context, if, if you're interested in looking at the site context
If we could go to the Stepney Green Conservation Area Appraisal first, that's at CD 11 .3.
Sorry, so say that again.
Sorry, the Stepney Green Conservation Area Appraisal.
Oh, the appraisal, yeah, thank you.
If you let me know when you get there, please.
Got it.
Great. And if you just, if I could ask you to turn to page 9.
And then the heading scale.
Is that internal page 9, I beg your pardon, or digital?
Digital?
It's digital, it's both actually.
so digital and internal pagination.
Under the heading of scale,
it says that the area is predominantly
two to four storeys in height.
And that's your, and you'd agree that the conservation area
is predominantly low rise in character.
Predominantly, yes.
Predominantly, yeah.
And that's in the statement of Common Ground.
Yeah, just confirming that we are in agreed.
And so when in your proof,
Page 36, you say that the context, sorry I'll just give you a moment to get there.
So you can see what, referring to 6 .35, I think this is a distinction, we agree that
there is a predominantly low rise, but in 6 .35 you say that the context is not uniform
and the existing building is already larger than the historic terrace to the west and
the recent housing.
Is this 6 .35 of my evidence?
Sorry, 6 .53, I'm sorry.
Yeah, sorry, yeah, I was in the wrong place
Let me just get there and read it
So you say that the context is not uniform and that the existing building is larger than the historic terrace
Yeah, and then I add that does not mean the context should be disregarded of course
But it does present an opportunity to optimise the site. Yes, and so in terms of the
When you say it presents an opportunity optimise the site. I understand that to mean the fact that it's already taller
presents an opportunity to optimise the site, is that correct?
There is an established difference in character as between the site and many other sites in
the conservation area, so a change in line with that is in my judgement more of an evolution
of what's there than the introduction of something completely new.
So you don't take the view that where a building is already large or tall for its context,
it automatically means there's an opportunity for it to be more bigger?
But then of course this comment is relevant to the particular building and the fact that
barring Bellevue Place, which is a sensitivity we acknowledge, the setting for this part
of the conservation area is not sensitive to a change in height, that is to the north
and to the east.
So that's what that point makes.
That's the point of that.
And also bearing in mind that the bulk of the building, whilst it's in the conservation
area lies off the principal frontage of the conservation area.
So that presents an opportunity for optimization.
In the same way you would do it in a more traditional conservation area if you had a
deep site, you'd design and scale at the front and probably try to optimise the back.
And Curtis has a more general question before we get onto impacts.
Do you agree that it is possible to over -develop a site?
A site?
A site.
Of course.
And you agree that if you were to over develop a site you're not optimising that site?
And you agree in terms of when we're looking at whether
over development is taking place,
a key consideration
is the existing site context?
A key consideration and the size and disposition of the site.
So it's not the only consideration.
And the sensitivity of the uses.
So size and something, I didn't catch the second word,
it's your size.
Size and disposition of the site and the sensitivity
of surrounding uses.
Those are all objective considerations
when you're looking at getting to optimisation.
Thank you.
So moving then to the impacts, and I'm going to take townscape
and conservation areas together I think
because that's how you've addressed it.
So if I could ask you to turn to your appendices.
So 3 .2a, please.
If you could give me the internal page, because that's at the top left, I think, or top right.
I will.
Sorry, my computer has just decided now that it's going to have a vote.
I already had this.
I'm not trying to get into the end.
Sir, I do have a spare paper copy but I hesitate to lumber you with it.
So we're going to page 96 on the PDF, which is also page 96 of the paper version.
So page 96 I have is the existing south elevation in context.
Thank you.
And you agreed and you mentioned in examination in chief that if you're on the other side
of Mile End Road, so if you're looking at this elevation, you can see those window openings
in the auditorium?
Some of them, yes, absolutely, and the flank wall.
You say some of them, but those ones?
Well, probably the top three, mostly, because the angle of vision means you probably don't
see the lower ramps.
I'm sure, yeah, the inspector will be able to see on the site visit whether it's, I take
your point that there is obviously an elevation issue here, but you can see those even though
the building is quite a bit set back from Myland Road.
Correct.
Correct and if we go to just scroll down or turn pages if we're in hard copy to
page 100 so that's that's the same same building you're showing showing the
demolition and actually it's 101 is is the next is the next one I want to go to
so we have here it's again the same elevation and we have a line and just
behind these buildings, so behind the Genesis cinema, that is the proposed new drawing?
Or proposed new development?
Well the first setback is 25 metres back from the frontage, and the second is a little further.
So when you say the first setback, that's the kind of lower line, is it, you're talking about?
Well, so there's the thing that's drawn, the frontage piece is drawn in solid line,
then there's the first light line, which is part of building A,
Building B is the first setback on the left side.
And then building C to the north is the top two setbacks.
Broadly.
So when you say top two setbacks, I'm not sure.
All I see on this one on page 101 is you have the cinema frontage where it says site.
There is coming at the top of the site you have a line, which I think is the building
And then you've got another wire line, I guess if you call it that, that goes at the top
of the mosque and comes down 107 to 115.
That's what you're talking about.
I know you were talking about the setbacks, I think we're going to make come on to that,
but that is the silhouette of the development from facing south.
Sure, but you would never see it like that.
That's a pure elevation.
Because the road isn't wide enough to step back to see it.
I understand that there will be some issues with elevation but that is, you say you will
never see it like that, but that is what the elevation is if you were to be able to see
it like that.
Yeah, sure.
And the heights are matching the scheme that was in front of the council at their request.
We looked at that, which is in dotted outline to the right.
To the dotted line to the right, that's not...
No, it's not consented, but that was the reference scheme we were told to look at.
And if we go to page 106, I just want to confirm because the line drawing is just slightly
different, perhaps you could clarify for me.
So if we just look at 101 and then we compare it to the drawing on 106, I know the lines
are pretty faint here, but the extent of that, and again I take the point that there is some
elevation issue that you might not necessarily see it like this, but do you see the line
comes down at...
Sorry, which line?
Can I just ask?
I've got the drawing, please, I see the green, it's a coloured elevation, so take me from there please.
So on, what I'm talking about is the two, both the right and left hand vertical sides of the building,
the far right hand one ends before the end of what I believe would be, I think it's referred to as city gate,
but it's that, I think it's 99 Mile End Road actually, so it ends beforehand,
but if we go back to, if you just have 10100 open as well,
when we looked at, or 101, sorry, that wire line extends all the way halfway along to Mile End Road 107 to 113
and on the other side, on the left hand side, comes out of the mosque,
so just the wire line on both of them doesn't seem to be consistent, I was just wondering which is...
It's probably the angle at which the drawing is made.
The important drawings, because the faint line drawings
are just there to show context and depth,
the drawings that the scheme is based on
are clearly the elevations.
And just to make the point, if you're on 106, sir,
you see there's a key plan in the lower register
above or below the scale bar,
and you'll see that you don't really see that as a pure elevation,
A, because of the angle of vision,
but B, because the elevations you're looking at are different distances set back from the plane,
which jumps that you get.
And I just will also say that that key plan is quite helpful,
showing the footprint of the building relative to the whole of the site,
because I was asked a question about overdevelopment earlier,
and certainly one of the considerations you look at is how a building sits on the site,
And that's what I had in mind is the degree of occupancy of a building on the site
But and this doesn't this building doesn't begin to occupy the full site
Okay on this so yeah, I I see the discrepancy I'm talking about. I'm looking at the key and the
Site location under each one. It looks like
On PDF 101. It's sort of angled that way
Yeah, so that that was the point about the non -alignment thank you sir for assisting
So 106 is a dead north elevation and that means the alignments that you see on
101 are different because that's an elevation done for whatever reason to the northwest
So that accounts just to clarify for the differences
In the elevation to the rear. So thank you
We just look at if I could ask you just to look at page 89 it's the same drawing but I just find the
89? 89 of the same, it's the same one but the lines a bit clearer so I find it easier on the eyes if you don't mind.
So this is again the south elevation facing the genesis.
So in colour we've got the street frontage and in background in the faint lines we don't have,
I haven't been able to find any version of this drawing where you can see the materials in colour.
Is that because there isn't one?
Oh of that elevation to the north?
Yes, or the side elevation.
Let me cheque.
I have checked quite clearly and I don't believe there is a problem.
Well then, yeah, that's a good point.
I think that elevation is, well it's going to be matching the elevation to the sides
because that's obvious.
So I think to understand the elevation, sir, you would go to, for example, page 107.
If you've got that, that's a coloured elevation and do you see key 4?
yeah so that's that is that 107 did you say that's 8 1 0 7 the very so working
from right to left you have the green faience building then you have building
B and you see it's top floor seventh floor I'm looking for one that's no I
understand perfectly well no no I understand perfectly well and I think
I haven't found that drawing, so it's a fair point.
All I was trying to do was to say what that elevation is intended to be like, and it's
that upper elevation to the east and to the west.
So it's effectively a series of openings which are shown on the elevation with that material.
And that is the model.
That is what was rendered within the models.
Do we need that for a complete plan set, or is it not really relevant?
Well, why don't we discuss it with the council outside the hearing?
I think it's reasonably clear and it's going to be conditionable anyway.
Yes, I think I understand what you're saying.
Yeah.
But maybe discuss with them some of the other decisions.
Well, I just want to make sure that we do agree that we know what we look like and if we can,
then I, you know, we'll take a reasonable approach whether we need an actual drawing,
but just if we turn to page 90 then this is a cross section, so I think we can see some
of the materials in the cross section, obviously not, we don't, so this is just page 90, so
the one after, we can see what it looks like obviously without these buildings in between.
I'm sorry, I think you need to slow down actually, sorry, I'm having trouble following.
So page 90.
That's right, I think the missing elevation then is the effectively, sir, on page 90,
the top two floors of what's shown in section.
Yeah.
So, yeah, so yeah, we think...
I think, I think, I mean, sir, I agree, it's an entirely reasonable inference to draw that
the elevation is similar to the side elevations, and that's what was modelled.
there has been an omission in that drawing, you know, if the council wants a drawing then
the applicant can provide one, I'm sure.
I think the point that I just wanted to say is that when we look at this viewing on page
90, while it's true that we have some light materials on, say on page 90 we've got on
the right -hand side of the building as we face it, you've got that lighter colour is
what you've referred to before, you've got windows above that, I think you're saying
the middle block I think we know is also going to be,
at least at the top floor is going to be
light coloured materials as well.
Well that was what was drawn in the model
that was modelled in the AVRs.
The AVR, yeah, so we've got that.
But then we also have some darker colours
still at quite a high elevation on the left hand side.
Well I think if you put all the drawings together
it's pretty clear that the east and west
and therefore south elevations of block B,
which are the light colour elevations, are all stock brick.
Okay, so if we just go.
with the light green faience cladding to the top floor.
I just want to take you just to some of the viewpoints then because I know you're saying
how...
Oh, it is a light colour.
So it's a light, light colour.
On page 163, or 164, sorry, we've got the viewpoint overviews of the different views.
I know we...
Sorry, yeah.
Is this the TVIA?
So this is within your appendices.
Oh, so we reproduce the views within the appendices.
Sorry, yeah.
Just because you have them all in the same document.
Yeah, no, they aren't.
Yes.
That's true.
With the pigmented coping, which is nine.
So my intention is its exact reproduction of that elevation.
I'm actually just to note that you've brought to this, I just didn't quite follow, when
you said the brick goes around the corner, do you mean around which corner Dr Moon is
To the north.
I mean, just to insist, I think the inspectors got it, that the bay elevation to the north
facade is effectively what we're looking at in Block B facing west. Right?
Okay, we'll maybe come back to that. I mean, it has to be because the material
comes to the corner anyway so you wouldn't change materials.
It might be just I'm getting confused about east or west but just when I looked at 90.
90 is the west facing elevation.
90 is the west facing, I thought it says proposed south elevation.
Okay, I can look at that.
Which...
Yes.
No.
Yeah, no, it actually faces towards Bellevue Place.
It's the west elevation.
Yeah.
Yes.
Correct.
Yeah.
Yes.
And the window openings indicate that and the height indicates that.
It's just that that drawing of elevation is not in the pack.
There's a section instead.
Okay.
So we'll move on then just to the viewpoint.
That was page 164.
In your appendices.
So we have the viewpoint overview.
Can you see Cleveland Way coming down from the north, the kind of larger that intersects
with Marland Road just to the east?
So are we looking at the viewpoint plan on 164?
Yes we are.
Sorry I thought it was 163.
So you have Cleveland Way that intersects with Marland Road and to the west of where
it intersects you've got viewpoint one and then you've got viewpoint nine and to the
east of the existing cinema and there's no viewpoint between those two points.
Because there are trees.
There are really mature plane trees along most of them.
You can see them in the baseline photograph on the following page.
So the reason you didn't take a viewpoint is because there were trees?
Yeah, we wanted a clear view to see the whole of the listed building in profile.
The other reason for selecting that point of view, sir, is that given the format of the lens,
you pick a position which shows the whole of the asset you're trying to photograph.
So it's a combination of factors.
and also a position which through the view city analysis we did we reckoned was the place where it was most likely to be most visible.
That was why I picked that view.
But you accept that without a viewpoint in between it's difficult to conclude how much you would see of the upper floors.
No, it isn't difficult.
Could I just finish the question? Difficult to see how much you would see of the upper floors as you walk between viewpoint one and viewpoint nine?
Not at all, because you draw an inference with the benefit of the drawings in your experience
and it's quite clear as you move towards the object the relative distance and degree of
separation would increase.
So the gap between the historic building and the top that you see would increase.
So if we just turn to viewpoint one, page 166, you agree though that if using your inference
that as you walk east from this photo, what you see, whether it's above the parapet or
in the landscape, will change. I think that's exactly what you'll say will change. So what
you see is not limited to what you see currently in viewpoint one.
Of course, and that's because, sir, these are indicative viewpoints in the language
of Guillia 3. You don't model every six metres. You form your judgement on the basis of an
And the HTVIA, just to note, doesn't assess individual photographs, it looks at visual
experiences, which is the methodology we follow, which is accepted best practise.
Okay, but you accept that despite being set back, you would be able to see the height
and massing of the proposed building from the other side of Marlin Road?
Yeah, you'd be able to see the top floor, absolutely, and there would be more visual
impact than you see now and it would gradually disappear as you walk into the scene because
you would then be, the angle of vision would change and the buildings along the frontage
would interpose.
So this was the position where you could see the most of the development in association
with the landmark feature, which was why we picked it.
And in a relatively open setting that enabled you to frame the shot so you could see context
And it was a shot that was prepared early in the process and shared with the council and we never had any requests for
intermediate views
Okay, and just so turning them to your proof
Page seven point thirty and this is just to two or seven thirty page forty
I didn't think it was seven hundred thirty pages
Page 14.
Yes.
So this relates to, so just so you understand the context, this is, it says Marland Road
frontage from the east.
I think it's actually from the west, because I think you do it in the first verse.
Oh, yes, thank you.
That's fine.
So it's just from the west.
And this is where you're describing the cladding, and we've discussed this both in Miss Lambert's
evidence and also you've just mentioned there that the cladding proposed at the very top
is light coloured to reduce its visual impact.
But you accept that it still has a visual impact even though it's light coloured.
Sure.
Well visual impact is a neutral term. There are impacts and effects. So impact
is you know is the word used in HDVIA. It doesn't mean that impact is
negative. Okay doesn't mean yeah. I mean that's standard. But you accept that you will see it
more if say as in you accept that you'll still see it even though it's light coloured.
I think that's common ground.
But let's sort of, yeah, that's kind of obvious.
Yeah, it's kind of, and you'll see it more
depending on, you know, if you've got,
if it's blue sky or dark clouds compared to a grey sky.
Sure, that's right.
But there is a general gradation in sky dome colours
on light and dark days from darker
in the upper part of the sky to lighter
in the lower part of the sky.
And do you -
So it will always have an effect of, sorry,
it will always have the effect
of appearing recessive and setback.
Do you agree or disagree that you will sometimes see more than just the light cladding?
I'm from the Mile End Road.
From Mile End Road?
No, I don't agree with that. I don't see how that's possible really.
So you don't think you'll see anything more?
No, you wouldn't see the brick.
Wouldn't see the brick, but could you see any other...
From this stretch of the Mile End Road, no.
Because this is the point at which it's going to be most visible.
And even if for the sake of argument there was a glimpse of it
I'm not sure why that would make any difference because it's like coloured stock brick and stock brick is a common material in the area
So you said that you may see a glimpse of it?
I think it's highly unlikely
My evidence is clear on that point if for the sake of argument you were which I think is unlikely
Then the stock brick colour that's proposed is also light
Okay
And and then just just to confirm when seven point thirty when you say this element
So you're referring to the light, the top of the building would not be read as part
of the conservation area because it is set back from the frontage.
Yes, that's right.
You're saying that a person will not perceive it as forming part of the conservation area.
That's exactly what I'm saying, yes, because the conservation area here, like the townscape,
is defined by the enclosure that's comprised of the buildings flanking Mile End Road.
And your appreciation of the conservation area at this point is linear and this is clearly set back.
And I said earlier that the distance from the front to the is 25 metres, that's a significant distance.
Which means also as you walk there's a degree of separation that you feel because of the changing relationships between objects when you move.
But you accept Dr Meve that the question for the inspector is not whether the building
will be read as part of or perceived as part of the conservation area but whether it would
have an effect on the character and appearance of the conservation area.
Yes but that phrase sir is clearly intended to indicate that the dissociation of the building
from the conservation area goes to the reduction of its impact.
So I, yeah, it's one and the same thing.
Well, I may disagree about that.
In terms of the proof, the next sentence of your proof, you say at paragraph 7 .31, that in this part of London, I do not, you know, the witch has a very
7 .31
In this part of London, which has a very busy and commercial character, I do not think anyone would notice the proposals, rather their attention would be on the road, the trees, the long classical frontage, the active frontages immediately next to them.
So again, just to confirm, you're not saying that they wouldn't be able to perceive or notice the proposals, just that you don't think that most people walking down Mile End Road would be looking at the proposals?
I'm drawing a distinction between the theoretical possibility of seeing something and the act
actually of noticing it.
We see plenty of things that we don't take notice of and that's particularly the case
in the scene which is varied and busy and is well established.
That's an important distinction and that's why visual impacts in terms are not always
harmful or intrusive.
So it's quite common distinction.
So I just want to confirm whether you are referring to someone walking down the road
or you're referring to someone looking from this viewpoint?
The whole of this is about the general experience.
We don't assess individual views because it's kind of artificial.
I just want to confirm that you accept that if a person does look up from the street and
does notice them that they would consider that they would detract from the significance.
No I don't say that.
You don't accept that.
No.
Okay, so can we turn to the I wanted to talk about the impact on the conservation area and
107 one one three mile end road and I want to do this by talking
by reference to
Historic England's consultation response, which we've already turned to
Correct and I want to look at page three
And this is, if you look at the proposals on their impact, I'm looking at the third
paragraph in that section, starting with in the assessed view from Stephanie Green.
So this is referring to viewpoint four, which I won't bring you to because I think the inspector
is probably well familiar with that.
It might be helpful to have it open.
Well we can have it open then if you want to viewpoint four.
If you have your appendices open, we can look at it from there if you wish.
it's figure 7 .8 just above 7 .41 if that's the easiest document or we can have another view open.
I think it's helpful to have it open.
Yeah. Thank you.
And so their view is that the block would rise above the entire historic roofline of the grade 2 listed terrace
which can currently be appreciated against a clear sky and then they conclude that the quality of this part of the conservation area's townscape
and the former architectural composition of the listed terrace would be eroded through
the visual distraction presented by the student block.
Now you've come to a different conclusion, you said that there would be no harm, but
I just want to ask, whilst you've arrived at a different view, do you agree that the
position taken by Historic England is one that an expert could reasonably come to, that
it's a credible position.
And I say in my evidence as much so
that you may find it differently to me on this point.
I mean it's ironic, it's strange maybe to think about
credible differences of opinion which it kind of implies
the sort of untenable difference of opinion.
But there are judgements here which are around
the margins of things that people have different views of.
So just, yeah.
And I think the reason that I formed the view I have
is to do with the strong presence of the building
on the frontage and what you notice about it and also the sort of general context in
which you experience it which goes to what you notice, what you receive, what you take
for granted and so forth and different orientation and materials and so forth.
So I think just so we confirm that we agree that it's ultimately for the inspector whether
he prefers your position or Historic England and the council's position which are more
aligned on that view.
So then turning to the impact on Grade 2 listed Bellevue Place, I'm happy to turn up the relevant viewpoint.
I'm happy to turn to your appendices, so I want to talk about 6B, which if you're looking at your appendices, it's at page 180.
I don't mind really.
Yeah, the sequence starts 176 from the street and then 180 correct.
Yeah, 180 is the one that I liked.
That's the near view.
That's the rear view, yeah.
If I understand your evidence correctly, your view is that the existing wall detracts from
the immunity of the scene and intrudes on the experience of the listed building.
This is your proof at 8 .52.
Well, the lower part of the wall, but the upper part of the wall, which is later, yes,
I do think is intrusive.
And that was in my in chief.
Yeah, I've just confirmed that we're on the same page.
So it's figure 3 .6 of my appendices for your note, sir.
You've got the lower wall, this kind of, you know, unattractably rendered upper part, and
then the engineering brick above.
That's correct. I think that's a detracting feature.
So if you have your proof open because this is where you say it, so I was just looking at 8 .52, but I want to turn to 8 .54.
Sorry, 8. Please slower. I'm sorry. It would help if you went slower with the references.
8 .52 was where you said that it detracted from the mean t and sorry 8 .53 is where you recognise
why, and this is quite fairly, you recognise that someone might consider it neutral, and
that you said that you recognised, and you said this again quite fairly in your chief,
that how someone could consider it to contribute to this feeling of being removed, so that's
at 8 .54, and how that back of house feeling, and again this is your evidence, how it reinforces
that enclosed and intimate scale.
This is the stage of the setting analysis where I talk about the contribution of the existing site.
Just to set it in context here.
Just to understand that, my understanding is, correct me if I'm wrong,
is you're saying that you think someone could reasonably come to those views as to the existing facade.
So your view is that it's intrusive, but you agree that there is an alternative and credible view,
that it is neutral and that actually it contributes to this feeling of being removed.
Yes, that was my evidence in chief.
Yeah, as I thought, I didn't quite understand why there was some disagreement over this,
that's what your evidence in chief is, what's in your proof.
But you accept that if you were to hold that position,
as in if you as an expert had come to that view,
the view that's of the council and the residence of Bellevue Place,
if you were to come to the position that this wall is neutral and enhances the enclosed and intimate scale of Bellevue Place,
that replacing it with a façade containing multiple window openings would detract from that experience?
No, I don't think that necessarily follows because in the proposed state, as I explained
in chief, you still have a big wall there and you still have a building behind the big
wall, so the space is still enclosed.
There's a point on experience and seclusion, intimacy and so forth, but on intimacy, I
mean the scale of the front gardens of these buildings and the buildings themselves and
the little pathway you lock along.
I mean, you don't affect that scale at all.
So the first point doesn't follow
from the second necessarily,
because you still have to look at the impact
of the proposals, and the proposals do some
of the positive things that the existing building does,
albeit differently.
So, well, perhaps if I just phrase it
slightly differently then, so if you accept that there is,
if you were to accept that it is a enhancement,
and this is why I had under your evidence that the current existing facade enhances
the setting of the listed building.
I don't say that, I consider it neutral.
But is this a hypothetical question?
This is a hypothetical question.
If you were to take the view that it enhances or at least neutral to the building, do you
that there is a credible position that if you
could put further activity onto that wall,
whether it's openings of any form,
that you are detracting from the setting
of the decision.
No, I don't accept.
First of all, neutral and enhancement
are two different things.
Okay, well let's start with,
we'll take the midterm then.
Start with neutral.
So if you're saying it's neutral,
are you saying that if the wall currently is neutral,
are you saying that if you created window openings,
there's no possible way in which that could be seen
No, of course sir, that would be different. It's a different impact. But when you look
at what that sensation or experience would be, I'm saying reasonably it's different but
it has some of the same positive effects which as I said is being set away from Mile End
Road but still knowing you're close to it because of the scale of building which obviously
relates to Mile End Road. And I've given the other reasons in my chief about why I think
it's a better designed feature than what's there at the moment.
So that's the neutral point.
And I think the answer is that something can be neutral in one way.
And by the way, neutral here causes no harm in the stat storey test.
And it can be causing no harm if it's different.
You know, there are different outcomes here.
Well, there's the same outcome resulting from different conditions,
I think is what I'm saying.
Yeah?
Okay, and then taking the same point, if someone said that the fact that you have a blank wall,
so rather than saying neutral, but the fact that you just have a solid wall with no openings,
that that enhanced the setting, say because it focuses the eye on the buildings rather
than any other visual distractions.
If that was your view, do you agree that putting in openings and different features into the
wall would have an impact on, would affect the setting and therefore potentially...
I think my answer is the same in kind, which is to say if you took that view that it was
positive, then something different could also be positive. And I've given evidence on the
fact that one of the advantages of setting the building back is you actually clarify
where the historic demise of the development is with the wall, that's an enhancement.
It comes at the expense of some greater volume, but then the volume is ornamented.
So I think the answer to neutral and enhancement on a hypothetical is the same.
You can achieve both outcomes through different means.
Is there any way that the wall could be made worse?
I'm sorry, I didn't understand that question.
Is there any way in which you think, in your view, that that wall could be made more harmful?
The existing wall?
Yep.
Well if it wasn't repaired.
That's the only way, so if it was repaired.
I mean, myself, I think it's harmful.
I can't think of gradations of harm.
No.
I mean, I'm happy to answer a hypothetical on that, but by, for example, what?
I mean, it's a very abstract concept.
Well, so is it...
you could fail to maintain vegetation on it,
it would degrade the condition of the wall.
Sure, that would, that would enhance the,
that would detract further.
And openings, you don't think could ever,
putting openings as in window openings
at that location instead of a wall,
you don't think that would ever detract from it?
Well, no, because if anything,
an opening would make the wall less imposing,
because it would introduce human scale.
Finally, then, talking about the just on setting and significance, I think it's common ground
between us that the effects on the setting of a heritage asset may affect the significance
of that asset.
You agree with that proposition?
It may affect the ability to experience the significance.
Sorry, say that again?
The statutory test, the test in policy is may affect the ability to experience the significance.
That's the test.
Impact on setting is not the test.
It's often confused, but it's important to keep, it's a mouthful, I know, but it's important
to keep the words precise.
But you agree, I just want to make sure I get this right, do you agree that effects
on the setting of a heritage asset, changes to the setting of the heritage asset, may
affect the significance of that asset?
No, I agree it may affect the ability to experience the significance.
Which I think probably is the same thing.
But you know, it's a really important distinction this.
Well just if you say it's in terms of policy, so if you have the MPPF, should we just turn
that up to CD11 .1?
I want to look at HE 5, so paragraph 2.
So paragraph 1 and 2.
Just let me know when you get there.
If you look at 2 it says assessments of the potential effects of development proposals
on the significance of heritage assets, including through effects on their setting, should identify
where the proposers would be likely to etc.
So you accept that this policy is saying effects on the setting can have a potential effect
on the significance of the heritage asset.
That's right, but the best practise guidance and the approach to setting impact assessment
is as I've described it.
And so when you say in your proof...
Is this more than semantics to you?
Yes, it is more, well I think what happens a lot in the policy, in development plan policy
and also in the framework is that the mouthful of words is conflated into impact on setting
just for reasons of drafting. I'm not trying to make the policy mean something else, I'm
just commenting as an experienced practitioner in this area. So for the precise way of untangling
all that I looked at the historic England guidance which is very clear about the importance
of setting is what it contributes to the experience of an asset.
Now, so the caveat here where it gets kind of complicated is some settings themselves
are designated assets, and that's the case here because the conservation area is the
setting of a list of buildings.
So it gets a little nebulous, I think, in these circumstances.
But I think my point is you just always need to go back to special significance or special
interest, as the statute says.
And ask yourself in what way is, in this case, architectural or historic interest diminished?
You know, that has to be done rigorously, I think.
So I think the answer is more than static.
Just to confirm, you're not saying, are you, that however major a change to the setting, the significance of an asset will not be affected.
That's not your position.
The intrinsic significance of an asset will not be infected as a matter of fact, that can be agreed.
It just won't, I mean if you develop something outside of, which isn't a direct impact, then you don't affect the intrinsic architectural or historic interest of the asset.
But, you know, a setting change can clearly erode your ability to understand or appreciate that.
Can I just confirm, when you say the intrinsic significance, you're referring to the actual
physical structure of the significance deriving from the physical structure?
It's just that the term intrinsic significance is not something that we find in the MPPS.
No it isn't, but it's an obvious use of the word.
It means the inherent qualities of an asset, something, its oldness value or its architectural
value, what it is that it has.
The extreme example, a nuclear power station just behind Stonehenge for example, you're
still saying then it's the ability to experience this significance, not the actual intrinsic
value of Stonehenge.
Stonehenge is different because it's wrapped up as part of a design.
So for example, a design landscape like a parkland, for example, like Stonehenge, but
what we're dealing with are sort of discrete entities here. So I don't know how much of
Stonehenge is scheduled, but I think the whole of the area is archaeologically significant.
So it is a large asset, in effect, of which the megaliths are one expression. So harm
Harm to that setting would definitely harm significance because the significance is multifarious
and you'd probably also detract from your ability to appreciate insolent isolation.
Could we take a building then, so say Tower of London and you put a nuclear power station
right behind Tower of London.
Are you saying that that wouldn't affect the intrinsic significance of, that could never
affect the intrinsic significance?
It would affect the ability to appreciate the attribute of its outstanding universal
value.
Right.
Which I think could be...
Which is the important difference.
Okay, but which is often short -handed to affect to its significance.
Yes.
So I think it is, at least between us, I think the point is actually one of semantics rather than...
It may be, but as I said, it's an important matter of approach because the two are often blurred.
Which is why it's important to be precise.
Can we just go back just finally to Historic England and their consultation response?
We don't need to draw it up, I want to ask you just some general questions about this
response.
So as far as you're aware, the appellant had no input into that response, I take it?
It's from Historic England, it's got nothing to do with the appellant.
Oh no, no, no, not at all.
Well, no.
Historically...
Well, I mean, we gave them information, obviously, and discussed the scheme and showed them the
site and they walked around.
Sorry, sorry, say this again.
No, no, obviously our input was we provided them with information and they looked around
the site in our presence and the area.
That was the input, but the actual output, no, of course it's their independent view.
Okay, so just want to clarify that.
So you say they gave them information and they looked around the site in your presence,
And you said they looked around the area also in your presence.
I didn't walk with them to Bellevue Place but we showed them photographs and the modelling
information that I recall.
We showed them everything, we showed the council.
Okay, just for comparison, you did not walk with them to Bellevue Place?
No, I didn't come to the moment.
And no one from the appellant team walked with them to Bellevue Place?
No, but in the meeting we showed them the photographs and all of the viewpoints.
So we showed them exactly what we were showing to our handlers.
So they knew about it.
What meeting was that?
It was a pre -app meeting that we had, I can't remember the date now, it might have been
in late 2024.
I can't remember the exact date, let me see if it's in the letter.
So it's well before, it's actually probably before we saw the design review panel.
It was quite an early interaction with them.
This final design hadn't settled.
But obviously the letter we have is the consultation response on the basis of the file line.
So it was a long meeting, they looked around all the cinema, they received a full presentation,
including of the options analysis.
You said the design hadn't settled, was it approximate to what's in front of us now?
Yes, in terms of massing it was quite similar.
So the big move about pushing the bulk of the development away from the western boundary
had been taken by that point.
So it hadn't been fully detailed, sir.
Because we were still working with massing models, I recall at that point.
Sorry, so what, so you're saying this was early, this was 2023, roughly 2023?
No, I really can't recall truthfully, it's been a long time, but I mean it was,
I mean sir, just to give you an insight into when it would have occurred procedurally,
it's not unusual to, you meet the council two or three times on a site like this
and then you brief Historic England and we got a pre -app response from them, which I don't think is in the papers,
what matters is the consultation response.
And by that point, the scheme had begun to settle in its final form.
I recall, it might be Mr. Rowe's evidence, I can't remember, that it was before Design Southeast, or maybe at about the same time.
So roughly. But I think the pertinent point, sir, is that we, for your note, we showed them the full pack,
They were aware of the impact on Bellevue Place of a scheme in massing terms similar
to what we're looking at now.
And I led the presentation.
And we showed, we summarised the options analysis for them.
Sorry, you said that we showed them the full pack, so whatever the full pack was at that
time, but that's not necessarily the photos that we have before us today.
No, well actually, I can't, I really need to remember.
we had photographs of the viewpoints.
We had what's called a candidate views study,
where you have all the viewpoints agreed,
you take photographs, they might have been
survey photographs by that point,
and you put next to the photograph the model.
That's how I recall we did it.
So you were looking at existing and proposed
next to another with different levels of information.
The scheme hadn't been fully detailed.
But it's true isn't it though that in or around July 2022 the
appellants team hadn't visited, 2024 sorry, the appellants team hadn't visited
Bellevue Place? I don't think that's right I walked into Bellevue Place I
recall the door being open when I was first instructed. I don't have to get
permission from I mean maybe I just passed I don't know but I walked in I
I visited all the viewpoints that we were looking at shortly after we were appointed.
So you didn't say in a pre -application meeting at any point that you hadn't visited Bellevue Place?
Sorry, I didn't understand that.
You didn't say in any pre -application meeting that you hadn't visited Bellevue Place?
I have visited Bellevue Place two or three times.
So the point is though that contrary to what Mr Warren Casey suggested to Ms Lambert, you
don't actually know whether Historic England visited Bellevue Place.
No I can't say that for sure. I can't say that for sure. They were presented with the
information and we were told they'd acquainted themselves with the local area. I'd be very
surprised if they didn't just look at everything we looked at.
You said you presented them with the information but you said that you don't remember precisely
when this meeting was and you don't know precisely what information was provided.
So there is, Scott just finished the question, so he said you don't know, can't remember
when it was, you don't know what information was provided and you cannot therefore be sure
that the information you provided to them at that point in time included material showing
the impact on Bellevue Place.
No that is incorrect, I am certain because the approach we adopted I recall and which
we always adopt at meetings like this with Historic England in discussion with councillors
is to show them exactly all of it.
And I know by that point we'd done the options analysis.
By what point?
By the time we met them, so it was after November 2023, so it would have been in 2024 sometime.
I don't remember the weather, it probably was, I don't know, the winter or the late
spring.
Sorry, just so I, I'm just trying to keep up with the notes, so you said you met Historic
England in November 2023?
No, I said we sent them the options study from November 2023, so that's the date after
which we met them.
Okay, and in July 2024, we have a minute from a pre -application meeting saying that the team hadn't visited Bellevue Place.
Your team hadn't visited in July 2024.
That's not correct. I visited Bellevue Place after I was appointed.
Okay.
I don't know why the minute says that. I should have been corrected. I'd been in it.
Okay, so in short, just to confirm, you don't actually, we don't know, and you don't know whether Historic England visited Bellevue Place?
I don't know whether they visited, they had information.
That's the position.
And to confirm, I visited.
Okay, thank you.
No further questions, sir.
Okay, thank you.
This is John.
I know you're not the legal representative of your side and necessarily be back tomorrow,
but if you did have any questions, then you do have the opportunity now.
I mean there were a couple of points.
There was one point where we had said that we only thought it was only a lower part of
the more detached house.
Whereas in fact yesterday we showed elements of pre -1971 where it was the original brick
all the way up to 4 .3.
Can I be taken to that photograph?
It might be helpful actually.
Yeah, no actually.
Anyone would call where that was.
Yeah.
I also remember that as well but I can't remember where it was.
Now it would be helpful because I could confirm that based on what I can see or not.
Either we find it now or we allow Miss Taylor to bring that up again tomorrow morning.
Yeah, that would be helpful.
Okay, should we just flag it then for Miss Taylor?
In the appendix to Miss Johns.
Oh okay, I can look at it now.
It's that set of photographs.
I came from the time I was at the Ibroxburg History Library.
Thank you.
And I did some research there.
If it's alright, sir, if I could just find that photograph since it's been referred to, or I could be asked tomorrow.
But I will also allow Miss Taylor to bring us up again tomorrow for obvious reasons.
So if I could be taken to that photograph tomorrow I can comment on it.
CD 4 .1.
These are the photos that I need.
So it's 4 .1.
And was it the first photo I think?
Okay, let me have a look.
Looking at your closet wing.
Was this a photo looking at your closet wing from the rear?
Oh, yes, is this it?
Okay.
I can comment on that photo though.
I think it's the one that's on PDF page 25 or your internal numbering is page 17.
Is it this photo?
Yes, 16 versus 25 I think is the answer.
Yes, I see that. Okay, I can comment on that if that helps.
Actually it's really helpful and thank you for drawing my attention to it.
Yes, I was going to invite you.
Okay, thank you. Please comment but I will obviously allow Miss Teddy to ask further questions.
It clarifies the point.
So if we're looking at the photo before the render,
which is page 15, I think, thank you,
it's a kind of sepia -tinted black and white photo, right?
So sir, I'll start from the top.
If you follow the, if you go down from the parapet
of number 11, it was John's house,
do you see there's a pinkish colour, a light colour, Greg?
Yes.
Okay.
Then you'll see about the midline of the window
on the wall, a series of brick corbels.
Yeah, projecting big details.
Yes, okay.
To my eye, it looked like Victorian brickwork.
So actually in my evidence, I speculated
the render bit might be part of the Paragon Theatre
or something like that.
The render also doesn't have any detailing
like those pilasters in the other part of the wall.
And I think then the Victorian wall,
if you go to the next page, which is the render,
I say the George, I beg your pardon,
is that lower part, which is now unrendered.
The reason I say that is, looking carefully at it,
it seemed to me the coping was old.
And actually, funny enough, sir,
if you look on that photograph on page 16,
oh, this is really fine detail here,
but do you see, right above the downpipe,
you get some brick staining?
And there's a ghost of a cornice that's been cut away against Ms. John's house.
That's a remnant of that corbeled cornice I pointed out to you.
Does that make sense? It's quite a fine detail.
So I'm starting at the down pipe.
Yeah, start at the down. So look at the, you have the entrance, the round arched opening, sir.
The rainwater good, I guess it's rainwater good,
you have rises in the joint between the buildings.
It then, your eye should follow up on the crease
between the buildings.
On this John's property, there's light brickwork
with some staining.
That is the ghost of the cornice of the 1870s wall.
It's really fine building archeology,
but I'm pretty sure, I mean just looking at those two
photos, I'm pretty sure that's what it is.
So I think it's probably a three phase wall and I would be surprised, sir, to come across a full height, nearly full height wall on a house of 18...
I've never seen it before, but I mean, I might be wrong.
Can I just say one thing? That that wall there follows the line onto my memory and down the path is exactly the same height as the first wall down the path which was built in 1875.
Well that would I think reinforce my interpretation, that when the brewery or the theatre had demolished
the rest of Bellevue Place, they built a new wall and then returned the wall on the Georgian
wall.
So the question is what is listed, and the provision is section 1 .5 of the Planning and
Listing Building Conservation Area Act, things attached to or in the curtilage.
Right? Now I, true, it's such a complicated legal point, because the main part of the cinema wall can't be listed by attachment, that would just be, I mean there's case law on that, it can't be a larger part of a building is listed by,
The 1875 bit of the wall, if that's what it is,
I don't think I would treat it as listed,
because it wasn't built as part of a listed building.
It's simply a party wall structure,
which is built on top of the listed wall,
which is, in my judgement, what's below the coping.
What it means, sir, I think, therefore,
is any works in due course to that wall
affecting its special interest,
for example, on the development side,
would require a list of building consent but of course repairs don't require a list of
building consent. So it's a point to be determined at the time, which is not unusual in the case
of complex construction projects on abutting urban properties.
Okay, and that's what you said in your written evidence. It might help me just for when I'm
writing up my decision to have that case law on the, if that could be submitted please,
It's in the historical inside.
Sorry.
Okay, thank you.
Thank you.
Anything else?
Any re -examination, Mr Warren?
Yes, it's 25 to 1. I do have a little bit.
You're happy for me to carry on now?
Probably.
Probably.
Okay.
Thanks.
Dr Mealy, the
questions you were asked towards the end of the
cross -examination about
what Historic England did and didn't do
and what they didn't see
when they went on
their site visit.
Can I just ask you to have another look at Core Document
5 .8 which is their
consultation
It's addressed to Ms Cameron and it's their consultation response on the application,
rather than a pre -application document, obviously, because it refers in the first sentence to
Ms Cameron's letter of the 10th of April regarding the application.
But the exercise that this carries out is to identify, doesn't it, what assets, both
Historic England are interested in commenting upon yes, is that right? That's correct and
In it
Do we find as I won't lead on it we can read it do we find?
reference in it to Bellevue Place
Didn't see it, but they do refer to the HTVIA
which had all the fully rendered views.
We're not asking about what they saw, they obviously were sent the materials.
Does this Historic England assessment and their position encompass or represent a view by Historic England, do you think, about Belville Place?
I think it has to because it had in front of it the HDVIA and it acknowledges that.
So it would have had the information of a fully detailed scheme in the views that we've
looked at.
Yeah, it had the materials there.
Just looking at the section entitled Historic England's Position, it covers the Genesis,
do you see that, the fourth page, the Genesis Cinema itself, do you see that?
And then references to the roofscape from Mile End Road, which is obviously the listed
buildings on Mile End Road.
And so does it appear that, what does it say or not say about Bellevue Place?
It doesn't mention Bellevue Place expressly, but it refers to the conservation area, the
and it would have had the information fully detailing all the listed buildings in front of it.
I'll just put a mark down so I'll ask Ms Cameron about what was sent to Historic England in her letter,
what was referred to in her letter and what they had. We can see what they felt it necessary to comment on in their consultation.
Okay, otherwise I didn't get the sense from the questions that a particular point was
being made about what historic England officers had seen of the conservation area more generally
or the Myelin Road properties.
Do you have any, what's your feeling or view Dr Mealy about how well armed with facts and
and views and so on historically.
Well, just to start just by reiterating the point that they had full information about
all the heritage assets and they had early modelled views and the viewpoint plan and
then when it came time to assess the scheme they had the full package of information.
So that I assume therefore that they read the HTVIA, they looked at all of the listed
Buildings and they chose and assets and they chose the comments on the one that they were concerned about
Yeah
Thank you
I
Don't know whether you can remember this dr. Miele if you can't then obviously say so immediately
But the author the particular inspector who's dealing with it in the consultation response. Oh, yes, so
Yes, so Mr. Young is an experienced officer in the East End, but he was the person we
saw at pre -amp.
He was the person you saw at pre -amp.
Okay.
Thank you.
All right.
I'll do you though, I have to get out of phrase this.
Are you surprised they haven't commented in more detail on Bellevue Place, given its proximity
and that it's listed?
No.
No, I'm not surprised actually.
I mean there's a statutory requirement to refer certain applications to historic England.
For example in this case it would have been triggered by demolition in the conservation
area and a development over a certain volume and that's in the procedure for handling heritage.
It used to be a statutory instrument but I mean that's the way it works.
But they never limit their comments to the specific reason for the consultation.
They would look at everything having to do with the historic environment and in my experience
they won't demure from commenting on something which it only affects grade two building,
for example, which they normally wouldn't be consulted on.
And the demonstration of that is in their consultation response because they do comment
on grade two buildings.
So they were clearly alive to assets that were below the two star because the other
threshold referral is affecting the setting of a two star building.
So in simple terms, no, I don't think so.
I'm not surprised.
I think the only other point, Sir, I'll just tack on in the light of your question is,
in your experience, Dr Mealy, first of all, the Bellevue Place inside or outside the conservation
area?
Oh, it's inside the conservation area.
Does the inspector have in front of him and have you seen any indication or anything which
leads one reasonably to infer that Historic England didn't look or assess a part of the
conservation area right next to the site?
No, I have seen nothing and just to elaborate the point, so I mentioned in my answer to
you sir, that the point of referral is demolition in the conservation area and therefore their
concern is the impact on the conservation area, not just of the demolition but also
of the new building. So it would have been remiss of them not to look at the relevant
affected parts of the conservation area and I don't think it was because in London and
in this, well you know, we had a very experienced inspector and we provided him with full information.
Thanks very much.
I'm going to go back.
I just want to give you guys an expression on what the
I just want to get back.
Not that you want to just go back to the beginning.
But the new world.
The storm.
And I just want to think about this point about the
Yeah.
Yes.
and umm..
So the applicant has justified the need to adapt the cinema offering at the site, which
I think means replace it.
Ultimately, none of the options presented have been found by the applicant to be appropriate,
and it was not challenged by the council.
And you may have had it in mind, but you said on the one page,
that it was also a test, because it was a cross -border tree.
But it is a test for us on 15 .12,
and it's in the stages on the ground,
and it's in page 4 .1.
Let me just go to the...
...route that.
Sorry.
Yeah, one moment, sorry.
So CD1.
Yeah.
Thank you, one moment.
Yeah.
I'm there.
Yes.
And there is a note that says, if you're in PDF 16, 29 section 8, towards the foot of
that page, it's in areas of green.
And if you go in that piece to page 0 .1, or 0 .4, you'll see a area of the cinema.
Yes.
Yes?
And there's a note in 8 .1 .6 about which you can express impact to the additional form
of all the accruing that you see that the appellant considers in the album and it prefers
to address the matters of disagreement.
Then it goes back to the matters of agreement and what does it say in 8 .1 .7?
Well that the appellant has justified the need to adapt occurrence in the roughing on site,
which is similar to the committee report, the Appellant Preparedness Options Appraisal,
which is what we talked about, and the Council has not challenged this study. The principle
of re -providing the cinema use is accepted. So from that I infer that everything that's
presented in the study is agreed with the Council.
Yes. Now, obviously you were asking about the degree of impact and it all going down
like weight potentially due to the loss of the, the loss of the non -persistent family
I'm not aware that that's part of the council's case.
Well that's never the Council's case and it's not its case now because that in a sense would
be quite inappropriate because Section 72 entertains the possibility that the building
may be redeveloped.
redeveloped.
No.
Okay. Moving on. Yeah. Could you go back, please? This is sort of a contrast of the,
the cinema, again. So fine. Let's see if you can find the mic. Sorry.
So sorry to interrupt, your microphone's not on.
You're so kind, thank you.
Sorry, I wasn't looking at the light.
Thank you, Mr Cameron.
Could you go back to the Historic England response again?
I'm sorry, Dr Meena, it's a different point.
This one, core document 5 .8 again.
Here we're dealing, if you've got that to hand...
It's one of those documents I had but then disappeared mysteriously.
Let me just go to the digital document.
CD5 .8, that's it.
Yes, I've got it.
And one of the things, I'll take you back to that passage that is headed, Historic England's Position, page 4, and it talks about the cinema in the first paragraph of that section.
And it is, isn't it, the second sentence, the one that begins, while the cinema retains, do you see that sentence?
Which asset is it talking about there in that sentence? What is that sentence?
The existing building.
Yeah, but it goes on to say and therefore the contribution it makes to the conservation area in accordance with its demolition would cause harm.
Presumably, do you read it in this way to the conservation area as well?
Correct.
Yeah, absolutely, okay.
But in terms of how much weight is given to that by matters of degree if you like, by
Historic England, in that section you'll see the contribution it makes to the character
of the conservation area is what?
Well it's as they say, relatively modest and that's arising from their judgement that the exterior is relatively plain and altered.
Did they say anything more about weight?
No, I don't think so.
One other point that connects to this and it goes to the assets that they talk about here is at the top of the final page just before their recommendation if you like.
There's a sentence that begins, we recognise.
And the things that they recognise in terms of efforts
to minimise harm are set out,
are said to include various things in the second sentence.
And which assets do they, as it were,
are they most referable to those changes?
Reduction in height.
The reduction in height, I'll start taking each in turn to the student block, would have
been deemed to be mitigation both to the conservation area impact and to the impact on the list
of buildings on Myland Road and I prefer also, since they're making a general point, to Bellevue
Place. But I think that the second of the, and then the second, refinements to its design,
That concerns mitigation by way of increasing setbacks and introducing different materials
and a certain kind of detailing and that would comprise mitigation again to the conservation
area and to the list of buildings because those were all areas that we, where we use
those refinements to reduce or mitigate impact.
Yes, thank you.
Couple of other points, then we're done.
You were asked some questions about the townscape and conservation area effects together, if
you remember.
And those questions began by going to your appendices and having a look at the elevation
of drawings, do you remember?
Page 96 was the first one you went to, and then page 101.
And when you were asked questions about the elevation looking from the south, if you like,
across Mylin Road in elevation, you said you'd never see it like this, if you remember,
and then in further detail on that point you said because the road isn't wide enough,
I mean the inspector knows this, but in terms of how much weight should be given in forming
views to what the elevation drawings show as opposed to what the AVLs show.
I would give no weight to that drawing because it's the way you actually experience the heights
relative to how you experience the attributes of significance in the conservation area.
I mean obviously they're relevant in terms of understanding the form of development,
but in absolute terms, in understanding heritage impact,
they are not necessarily an indication of heritage impact.
And finally on that, you were asked some questions about,
well you haven't got a view between one viewpoint, one viewpoint, nine,
do you remember that point, what happens, you said there are trees in the way, etc.
I've already covered with you, I think, the agreement on these viewpoints, indicative
viewpoints or representative viewpoints with the Council.
But at any point during all of this, has the Council ever said you need to do a kinetic
view in order to inform us or we can't understand what the effects would be without such an
exercise?
No, and it's not unusual even for Councils to request further assessment information
in the run -up to appeals and we receive no such request.
So the idea that there could be some other impact that we haven't modelled was not really
part of, I just read it for the first time on the council exchange evidence.
All right, we are there, thank you very much.
So that's all by way of examination, thank you very much Dr Meade.
Thank you very much Dr Meade, thank you.
Okay, so it's obviously an appropriate time for lunch.
When we get back it will be the council's viability witness.
It's slightly earlier than we were anticipating.
Is everyone still okay just to proceed straight after lunch?
Sorry I missed the question so I didn't hear that.
So we're starting with the council's viability witness after lunch,
which is slightly earlier than we were anticipating,
so I'm just making sure everyone's happy just to crack straight on.
I'm first.
Yes, yes, that's fine.
I think for my part obviously that's about starting at two o 'clock or whenever.
I have, well may I reserve my position until I've heard the evidence in chief about cross -examination.
I'm not suggesting anything but it's always prudent I think on these occasions just to wait and see what's said and how long it takes and so on.
We'll come back to the question of cross -examination at that point.
Okay. Thank you.
Sir, can I ask a procedural question?
Yes.
I've been suspended in live evidence. Am I released now until I come back tomorrow?
That's a good point.
Do you actively need to speak to me?
No, I don't particularly.
Well not really, I've got Mr Kessler line here, Dr Mealy's colleague.
I shall be sad obviously, but I think we can probably...
I just want to avoid doing something accidentally.
Yeah, no it's a very good question. Forgive me, I've forgotten, I keep forgetting about the additional cross -semination.
I think better safe than sorry.
Sure, okay, that's fine.
Yeah.
Okay.
That procedure would be better probably.
I know there are six parties in here but I think two prefer.
Okay, thank you.
I think because we're in London it's probably less of a logistical issue than normal anyway.
Okay.
Okay.
Thank you.
Thank you.
So yes, you are in isolation.
Okay, so should we have lunch come back at two o 'clock and then we'll start with in chief.
Okay, thank you.
The inquiry is adjourned.
Mr Rees before I turn over to the next witness.
Nothing other than to say just on your point about review clauses and effect on viability,
we've been discussing it a little bit.
I'm not quite ready I think to be able to deal with it now.
And I haven't had a chance to speak to my friend about any of that.
So just to flag so that that's absolutely got it.
It's with us but I haven't got an answer for you immediately.
Okay, well perhaps we'll just see how the witness goes and then it might be that we need to pause at some point to make sure that it can be covered properly.
And obviously I'll make sure I'm fair to both sides whenever we do that.
I don't know if there's much discussion with any of that.
No we haven't had a chance to come to a final position on it yet so.
Okay, thank you. Okay, so we'll keep that under review as we move forward. Thank you.
Okay, so I'll turn it over to you, Ms Bruce Smith.
Thank you, sir. Could you please state your full name for the inquiry?
Yeah, sure. My name is Olivia D 'Mello Browning.
Thank you, Ms Browning. I'm going to introduce you by reference to paragraphs 1 .1 to 1 .7 of your proof.
So you are head of viability at Tower Hamlets, which is an in -house consultancy set up by
the council, is that correct?
Yes, that's correct.
And you have been employed by the London Borough of Tower Hamlets since 2023 and you are, sorry,
so you have been employed since 2023 and you are currently head of development viability?
Yes, that's correct.
You have been a member of the Royal Institute of Chartered Surveyors since 2023 and you
have approximately six years of valuation experience.
This includes a variety of valuation types and purposes.
Prior to your previous role at London Borough of Tower Hamlets, you held the positions of
or chartered surveyor at Savills PLC for three years and you also hold a first
class RICS accredited honours degree in urban planning and real estate from the
University College London Bartlett School of Planning. So before we jump
straight into proof I just want to ask you to turn to your rebuttal. Do you
have your rebuttal proof in front of you? I do yes. If I could ask you to turn to page
4 of your rebuttal and specifically paragraph 5 .5. This just relates to comments you make
in relation to some transactions cited by Mr Brown and you give some figures there.
Is that information correct to the best of your knowledge and belief?
So I have noticed since drafting the rebuttal that the Orchard Wharf example referenced
in that paragraph where I say it reflected a value of $304 ,000.
That was in fact before purchases costs were netted off, so actually the $284 ,000 figure
which is referenced in James L. Brown's initial FEA CD9 .1,
should be that value, not the $304 ,000 as that is.
Okay, so is it?
The value of the post purchase cost.
Just to clarify, the $304 ,000 should be replaced
by the number $284 ,000.
That's correct, yeah.
Are there any other corrections or alterations
you need to make to your evidence at this point in time?
So also in the same rebuttal, so paragraph 5 .3, I make reference to comparisons not being made to regional market such as Aberdeen.
but I wish to withdraw that statement as I realised that the Portland House
reference had been purchased by an Aberdeen investment fund rather than
being an Aberdeen PBSA asset.
Okay, so you accept that the comparisons are located in, they're all located in London?
Is that the point?
Yes, so greater weight should be given to comparables that are in London and that are
as close to the micro location of the site as possible.
I'm just going to, are there any other corrections or clarifications you wish to make at this
point in time?
No.
Okay, so just turning then to, starting with your proof at paragraph, so going back to
specialist team, which is the main proof, a
paragraph 2 .7, you explain how for the
purposes of your evidence you relied on
specialist advice from Cushman and Wakefield's
capital markets team, why did you seek advice
from Cushman and Wakefield's?
It is very common in viability
assessments for viability
So in valuation, for example, in viability, it covers multiple different valuation types
that you have commercial, student, co -living, traditional, billed for sale, billed to rent,
and so there's lots of different valuations to cover. So it's very common for both applicants
and local authority viability assessors to seek additional external advice on certain
elements of the gross development value.
So in this instance, I sought advice from
Cushman and Wakefield as I thought it would enhance
the evaluation by supplementing additional
evidence that could be relied upon in the valuation.
So I have my own internal evidence and publicly
available sources available to me, but to have
an agent who specialises in student accommodation has access to sales transactions, comparable
evidence, which is the basis for a student valuation. I felt that this would further
enhance the valuation and provide more evidence and more weight to be given to the student
to the PBSA evaluation.
And you said that it's common for viability professionals to seek such external advice.
In your experience, what form does that advice take when you receive it?
For example, is it red book valuation? Is it something else?
Do you have any idea what form that advice usually takes?
Of course. So red book evaluations are for specific purposes.
So for red books it must be for certain purposes such as accounts purposes, for tax, loan security
purposes.
Viability falls outside of one of the purposes for red books.
So both James L Brown and myself, our valuations are by nature informal and it's made explicit
in both our FEAs that our valuations are informal.
And so advice that's often procured from agents on certain elements is also informal advice.
But informal in the sense that it's not a red book valuation, but the definition of formal,
it was independent advice. There were no fees related to the instruction that would infer that
the valuation by Cushman and Wakefield wouldn't be objective.
And what weight do you say the inspector should place on this evidence from Cushman and Wakefield?
So I would advise the inspector to provide considerable weight to the Cushman and Wakefield valuation,
given that it is an independent assessment of value and it's been backed by evidence that's been provided.
I understand that some of the comparables due to confidentiality reasons couldn't be
made explicit, but the valuation is logically set out and it has been verified by our ICS
valuers within their department, in their team, who within Cushman and Wakefield as
As a property specialist, they have various different arms, so they have a valuation.
They also have investment teams that are buying and selling the assets.
In this instance, Cushman and Wakefield have a variety of expertise to draw upon where
they can understand the types of transactions of student accommodation happening in the
market and they are able to supplement their valuation experience with this additional
information.
Also PBSA as an investment class, it's important that you use the most up -to -date information,
so I think getting a specialist to look at further evidence that they can supplement
I understand that the appellant has also procured advice from Savills on the financial side,
so not on the PBSA valuation itself, but on the debt funding side.
And that equivalent team at Savills sits within the same umbrella of capital markets as Cushman and Wakefield.
So Savills have relied on evidence from the debt market team within the capital markets team of Savills,
and then I've relied on evidence to supplement my evidence by Cushman and Wakefield within the capital markets division.
Okay, and just to pick up on one point there, you said that it should be given considerable weight as it is an independent assessment of value
and you may have seen that the actual name of the document by Cushman and Wakefield, they called it a broker's opinion of pricing
and a point is raised by Mr Brown as to this difference between price and value.
When you refer to it as valuation and it refers to price, what distinction do you see between
the two, if any, and what relevance does it have that this is called opinion of pricing
versus value?
Yeah, so I think this point relates to whether something is a formal red book valuation or
the market.
So the question is, what is the
type of pricing report produced by
Cushman as a market appraisal?
You may have seen market appraisals
being conducted by agents for similar schemes. It could be a
different typology of development.
In this case Cushman and Wakefield refer to it as a
broker's opinion of value rather than a market appraisal, but
there is no difference between the two
different types, the fact that it's called brokers opinion of value just means that it is an opinion of value
at the point of time that it was written.
Just to confirm because if we look at the actual title they seem to know, at least maybe it changed
and you can let me know if so, but they do seem to refer to it as a brokers opinion of
pricing rather than value. So just because you just said there that it refers to it as a
brokers opinion of value and I note that in your evidence it sometimes refers to BOV or BOP
Has that name changed or do you think there is any significance in this being called brokers opinion of pricing?
Rather than what you referred to there as a brokers opinion of value or is this just semantics?
So it might be helpful to go to
Appendix three of my proof. Yeah, so that's on page 51 of your proof
And then if you look at the introduction section, the broker's opinion of pricing, it explicitly
states what this means.
So we can see under what is a broker's opinion of pricing, broker's opinion of pricing is
an informal market opinion prepared for specific purposes.
It differs to the Red Book, which is a formal valuation.
And it lists out exactly what this is.
but the basic, in principle, it's an indication
of market pricing, whether you call it pricing or valuation,
they are just being very careful to not get it confused
with a red book valuation.
Okay.
So I think it's common ground that you provided
the appellant with a draught of this broker's opinion
of pricing on the 11th of September, is that right?
Yes, that's correct.
I just wanted to ask you about this draught, this came into Mr Brown's rebuttal proof,
So could you turn up CD 3 .4 and I want to look at 3 .4C,
I believe if there is a 3 .4C, sorry 3 .4B.
Yeah allow me to get that up.
I'm sorry, appendix C, sorry, yeah 3 .4C is appendices
and we're looking at appendix C to his rebuttal, so it should be under the heading 3 .4C, and
then when you click into 3 .4C there is an appendix C.
Yeah, I might just have to refresh. Appendix B, did you say?
C for cat.
Okay, so that's just loading. Yes, I have that open, and it says at the top, draught 8th
September subject update.
That's correct. And the final version, which you have appended to your proof, I understand
it's also appended to your proof, but it's appendix D of Mr Brown's proof, you can see
it on the next page. And if you look at the front page of that as well, you see there's
no reference to draught. And I think it's common ground that this was issued on the 22nd of
September, does that sound right to you?
Yes.
Were there any changes between the two reports?
There were changes, especially specifically as Scenario 2.
So if we're looking at, for example, the...
Should we start by looking at page 8 perhaps of the draught, that's going back to 8 Appendix C.
opinion brokers opinion of rental pricing
Yes, so if we're looking at
Scenario two which is the most relevant scenario in this case as this is with the nominations agreement at
Market rent. So if we look at this one if we look at appendix C
that version
We can see that the there are nomination rooms at the top at 45
weeks in length and then we can see 51 weeks for the market led rooms and we
can see that the average rent is four hundred and twenty seven pounds per
square foot and then if we move to Appendix D we can see that that average
maybe just let everyone yeah catch up so this is Appendix D and again page 8
Yeah, same tables, brokers' opinion of rental pricing.
So then we can also see that those rents per week, it's the same average rents, the same
rents adopted, but there is an allowance for summer income on the nomination room clusters,
and this has a 50 % occupancy attached to it.
So what that means is for the period between 45 weeks to 50 weeks,
there is an allowance for summer income, which is very common
within PBSA developments that are left to universities
that they would allow for a summer income period.
So previously that wasn't included in the draught Cushman and Wakefield
Subsequently included that which I also agreed with so that's why there's a difference in the
In the income on that page and then if you go further down
to the final
The penultimate page where it's the brokers opinion of investment pricing. So this is page 14 of Appendix D
So we're following, is that right?
We're looking at the final version.
Okay, yeah.
So page 14.
Where it has three different tables with the investment appraisal scenarios.
So we can see that the gross income has been changed to reflect that sum income.
So the gross income is 6 million and 49 401 and then the price in that table is 92 .8 million
and that is the net valuation of that PBSA valuation and then if we're then to go to
that same page in Appendix C.
We're looking at that table.
So this is page 14 of Appendix C, yeah.
We can see that the summer income is, sorry,
the gross income is reported as lower, as it does not include
that summer income as it was in draught.
And the price is 90 .4 million.
So this evaluation, I believe, is quoted within James R.
Brown's proof of evidence and this was intended not to be a
final valuation but a draught valuation and the updates to
these valuations were made very explicit as to why there was a
between when this evidence was given and when the final evidence was provided.
Could I just ask you to turn back to, well actually just while we're on, so if you're
on appendix, we're still in Appendix C on this table and we can look at the gross income
or even at the price level might be the easiest one, so the price you said was the net GDV,
am I right? Is that what you said the price refers to?
Yes. And so you've got the scenario one is over 92 million, scenario two 90 and a half,
and then scenario three is around 81 million. So you've got a hierarchy where the scenario
one, you've got the highest price or highest net GDV and then it gradually, scenario two
it's lower scenario three it's lower if we compare that with appendix D in
scenario one it's low with with the updates that you described the scenario
one is now lower than scenario two so the overall valuation as I understand it
is it is higher in scenario two than it is on the other two valuations yes and
in your view, is that a surprising result?
No, so I can explain why that's the case and I do not think it is surprising.
So the reason that valuation increased is, like I said, because of the inclusion of the
summer income and the reason why the overall valuation is higher than scenario one, which
which is the direct let option,
is specifically because the operational costs
associated with the rooms that are subject
to a nominations agreement are slightly lower.
So instead of 4 ,000 per unit,
they are assumed to be 3 ,750 pounds per unit.
And this is to do with the operational differences
between direct let units from the investor
versus if they are to be let on a nominations agreement by the university.
So for example, an investor directly letting the rooms will need to account for marketing costs, for example.
And those will be saved if the university is taking on the ownership of those lettings.
And there are other operational efficiencies such as the term,
As we can see from that previous page 6, if we went back to the tables, we know that the
tenancy lengths are assumed to be lower for those with the nominations agreement and that's
because...
Sorry, just to clarify, it's page 6 of what documentary are you referring to?
Of D?
D.
Is that D?
That's up.
appendix D.
I'm not sure if we see any tables on
appendix D, page 6.
The broker's opinion of rental pricing.
PBSA.
Is it 8?
Sorry.
Is it 8?
Sorry, yes, page 8.
So we can see that the tenancy length is
reduced for the nominations agreement in
scenario 2.
So 45 weeks.
So because the university will
offer new guidance on the
negotiate with the PBSA investor and they will often negotiate a lower
tenancy length to as this is more beneficial for their students. This will
mean that there will be a period where the units are not occupied compared to
the direct units so there will be savings on utilities for example the
the units will use less utilities due to the reduced tenancy lengths and they will also
um obviously other I think there's there's a few other operational efficiencies um also wear and
tear is also reduced um because they won't be the tenancy lengths are lower so effectively what I'm
between a nominations agreement versus direct let unit
means that there's a different operational budget.
And if you have a lower operational budget,
which is effectively a cost to the investor,
then the valuation will be higher.
And so that is why the valuation is higher
in the scenario with a nominations agreement
compared to the direct let scenario.
So that's because operation costs reduced but in your view the GDV doesn't reduce.
No so the way that the GDV, so the way that the gross income is calculated is different
so obviously we have a reduced gross income because the tenancy length is shorter.
the operator, the investor will look to compensate that by having slightly higher rents on the
nominations agreement units for those 45 weeks. But then with the inclusion of the summer
income that's a difference that we don't see on direct lets because they're let for 51
out of 52 weeks of the year. There's no inclusion of summer income but in the scenario that
we're both looking at, which is with the nominations agreement, the income is looked at differently.
Okay, and there's been some discussion you may have seen about the concept of a hard
nominations agreement, so I think you mentioned this in your rebuttal and certainly Mr Brown
mentioned it in his proof. Can you explain what assumption you have made regarding whether
agreement is hard and soft and what you understand to be meant by those terms.
So maybe if we just start off by understanding what you mean, what is
meant by a hard nominations agreement and then why you have assumed that for
the purposes, if you have assumed that, why you've assumed it for the purposes of your
evaluation. Yes, so a nominations agreement as has been spoken about is a
an agreement between the PBSA operator owner and a university.
And that university is signing a contractual agreement for those rooms to let out the rooms.
And the nuances of these agreements are to be made between the university and the operator.
and this is
so these agreements,
there's what we call soft agreements
and hard agreements.
Hard agreements is the agreement
that I've relied upon because
this is what I understand to be
the most common nominations agreement
within the market
and as we're valuing this scheme
based on how a market participant
would value this scheme
rather than a specific operator
or investor specific to general
Genesis I'm I appraise the scheme using a hard nominations agreement which
effectively means that the university for 50 % of the rooms there is an assumption that they will take on the
Letting's risk. They will let the rooms which means for the investor a hundred percent of those
Rooms are left to the university rather than having to source the lettings of those rooms themselves
themselves.
And then a soft nominations agreement by contrast.
You say it's not common but roughly can you say what it is?
So I think there would be less contractually, there would be less ties to the university
to, for example, be to fulfil the rooms.
I'm not 100 % sure without going into the detail specifics of what sorts of soft nominations
agreement.
Again, I don't come across them very often.
The main difference is you don't have that requirement that all the rooms are, the risk
you said for letting is taken 100 % by the university and hard.
I think that's the main difference and what I did just think of another point that might
So, why are you looking for that?
So, is hard all rooms lessing risk with the uni, or can you mention 50 % at some point
during your answer?
So, I mean all of the rooms within the 50%, so 146 rooms.
So, 100 % of the nominated ones, so in this case if we're assuming nominations are going
to 50 .1%, it would be 50%.
Bear with me a moment.
I think I was going to say something else about the nominations agreements.
Oh, this was what I was going to say.
So it's also very common that at viability stage, a nominations agreement will be an
assumption that will be made because it's very unlikely that an investor operator will
enter into a nominations agreement before planning permission.
So we make the assumption, well I've made the assumption as a viability professional
that it is, that as the development, as I understand that one of the planning reasons
for refusal has been removed because there will be a nominations agreement, I have assumed
that this will be a hard nominations agreement as consistent with other market, other PBSA
developments in the market that have also assumed a nominations agreement in place,
although there might actually not be at the time of planning permission.
So I just want to ask you about the gross rents and what evidence you rely on for gross
I know we touched on it previously in terms of how you explained how that might change,
but what evidence have you relied on in your evaluation?
Yes, so there's two different main sources of evidence to rely upon.
So perhaps if we have both references open.
So the first one, I mean if everyone still has that appendix C still open.
Or is it D?
The D is the latest one, is it?
So actually it might be easier to go to my proof of evidence with the appendices.
Just let me know if that version has the appendices.
So in my proof of evidence there is appendix 2 and 3.
So appendix 2 begins on page 48.
Yeah, 48, yeah.
So I will start with these.
So in order to value the student accommodation,
the student accommodation is valued using what we call
an investment method of valuation.
So that requires the professional to look at the
expected rents that you would expect to achieve at the
development.
So you would look at the investment method of valuation
So you would then assess different comparables which are
currently on the market.
So there is a hierarchy of evidence that the RICS quotes,
so you look at the evidence and you look for things such as the
quality of the accommodation, what levels of immunities does
the accommodation have compared to the other types of
to the proposed Genesis Cinema site.
What's the quality of the accommodation?
As you can see in this table,
some of the age of those comparables is slightly dated.
For example, there's one from 2010,
it's Bitterfield's chapter.
And then you also look at the location as well.
So we can see from this table,
There's some references to schemes in E1, in Whitechapel and Oldgate, and then a few
other schemes have been referenced in the borough, more further afield for example in
E3.
But this table for example gives you an indication of what the rents are per week, what the academic
year this relates to.
and in order to make a judgement, a professional judgement,
as to what the valuation,
what the proposed scheme would achieve.
Now this is all based on an assumption of
if the proposed student scheme was built today
and finished today,
what rents could be achieved in the market?
Because we don't forecast, for example,
what it would achieve when it is complete.
We imagine it's today.
So all the comparables are based on current rents,
current values and an assessment is made to adjust these comparables in order to
to get an accurate depiction of what the valuation, the market rent should be at
the student development. And now if we turn to appendix 3 which is the
I'm not sure what page number this is but PBSA rental comparable evidence.
It was 56 I think if we're using page numbers.
Yeah, I've got the from PBSA 64.
So this is the comparables that Cushman and Wakefield have explicitly drawn upon and similarly
to my table they've written about the rents per week and there is a range given which
will depend on the specific unit type, perhaps the outlook that that development has and
consideration to, and what Cushman and Wakefields has done is they've had consideration as well to
rents over the academic year, because over the academic year the operators may change their rental values,
include more or less incentives throughout the year, and so just taking a snapshot from one particular point
of the year is not necessarily representative of what the whole development will achieve.
So we can see that they, on the following page, where it says PBSA rental comparable
commentary and mapping, there's some more analysis, further analysis as to how those
comparables were used.
But in essence, the PBSA GDV is informed by comparable evidence
and that gross rental value is then
multiplied by the number of rooms within the development
to give you that gross rental value.
OK.
Thank you.
And just in terms of PBSA investment value, and I know we touched on that previously,
but maybe perhaps if we'd begin by looking at Cushman and Wakefield's evidence, because
they touched on this too, so just to get the page in words, PDF page 71.
How useful do you think or what use is it to look at PBSA investment value?
What's its purpose in your view in terms of informing your appraisal?
So the total investment value, I guess if we're looking at the on the column volume,
I presume that's what you maybe are asking about when you say investment value, you're
talking about the capital value?
Yeah, well I guess I'm talking about two different things, but yeah if you start by talking about
capital value and then we'll come on to my next question. So the capital value
gives you a price that was paid for these different assets by an
investor acquiring these PBSA assets so it gives you the kind of headline
headline figure of pricing and then
Next to it because obviously these and and just to say these transactions
range in terms of
whether they
The specifics of the scheme themselves
so
There's various schemes in London here of various
quality and
and how long these have been in operation for also varies.
So then in one of the columns where it says price per bed,
it then gives you a figure of a price per bed
which is effectively that volume capital value number
divided by the number of units it says in that column
but it could be number of rooms, number of beds
and it gives you a price per bed value.
Now that can be a useful cross -cheque to do in terms of when you're looking at PBSA evaluation.
This is a useful cross -cheque but it's not the sole basis of valuation to look at the capital value and the price per bed.
and the RICS explicitly defined this as well.
So the net initial yield adopted is where Cushman
and Wakefield and myself will have looked at these
to cheque what net initial yield is appropriate
to apply at Genesis.
And so, and just so everyone is clear,
the net initial yield is the yields that is applied
to the net rental value after you deduct the operational costs.
You then apply a yield to the rental value which then gives you your capital value, your
PBSA valuation.
So it's a subsequent of different assumptions such as the rental value, OPEX and yield.
and then as a cross -cheque, once you've done your valuation,
you can then have a look at what's that overall value
and what is that value per bed, for example.
I'm just thinking about it.
Do you apply yield or is a yield an outcome?
So in this scenario of the way the valuation is done,
the yield is applied.
So if you were looking at, for example, these transactions,
The yield is an outcome of the transactions, but how we value in viability for the purposes
of the gross development value, we need to take the yield as an explicit assumption and
justify why that yield is used and apply that to the valuation.
And then just while we're on it, so you said it's a useful cross cheque and just having a look at,
we've had a look at that table and there's also a table that's been produced by James O 'Brien
in his rebuttal or in his main proof at page 25.
Can you comment on this in your rebuttal?
So I just wanted to, could you just draw up that table?
In his main proof, so it would be 3 .2.
Sorry, 3 .4, I beg your pardon.
Sorry, sir.
So James L. Brown's main proof of evidence.
Yeah.
Sorry.
I might need to open that up.
So we still have a question,
so I'm getting back, so I'm afraid,
but you might be asking this a little bit more again.
The independent dispute, where are you buying
is the five questions you're asking.
So the purpose of being the reference of pricing,
page 8, the first sentence is,
it seems to me that the rate ranges from three months
to four to seven months, or is it?
I'm just trying to find the right reference.
Is it the, what's the title of the page?
Is it the introduction?
or no it's in this sections PBSA rental pricing the table we looked at before it
was on page 8 of the Appendix D but I'm in your own oh sure sorry yeah three
390 to 427 yeah.
Yeah.
Can you explain somewhere how they link the concepts to that?
So, in terms of just how they get to that number,
so the commentary in the previous page where it says rental comparable commentary and mapping,
this is giving you an indication of how they're benchmarking the comparables,
so which comparables they find the most similar.
So they place the most emphasis on Magneta House and then Pacific Court.
And so this is how they're showing, okay, so we think Pacific Court,
the rental values, when they say ahead of Pacific Court,
what they mean is the rental value should be higher than Pacific Court.
So this is how valuations are done is that you sort of benchmark,
because you're never going to have, the best comparable would be
If you had an identical scheme that was in an identical location,
then you could easily give an identification of price.
But when you have comparables that are different in context,
you then have to benchmark it.
So that will be their analysis as to how they've attributed that rental value,
that rental pricing. And in terms of the range,
to me that looks like a typo.
Could I just...
Blended range, I'm not sure exactly what they mean by blended.
If I could just pick up on that, is the blended rate referring to the average rent?
So we see the Snowy 3 average rent is blended.
Yeah, yeah.
No, no, it's fine.
We were just about to look at the table on page 25 of Mr Brown's proof, which is 3 .4,
so CD 3 .4, page 25.
Page 25, okay, bear with me.
Is this table 3?
table three yeah
so I just just want to understand in terms of the point you made that the
when we look at investment price and when we look at the PBIS investment value
that we can have this this can be a useful cross -cheque and I was just
wondering what your views were on this table in terms of what what sort of what
can you get from this in terms of whether it's a useful cross -cheque and
also from the average figure at the base of the table? So I think I think this
table is limited in terms of looking at the price achieved. I'm not sure this is actually
an extensive list of Cushmin or if I'm just also flicking back to the PBSA investment
transactions that we were just on in Cushmin and Wakefield.
If you want to bring that up in front of you, you can.
It's just back within your proof.
So you can have both tables side by side.
Do you have the paper copy?
We just have a page in the room.
I'm just trying to find the.
It's go to.
Sorry, we just looked at the table
and it's called PSA London Investment Transactions.
I was just trying to find the PDF page for you
I'm working off the paper copy. So it's just comparing the document that's in the appendix
to Ms. Domena Browning's proof and the table at table 3 on page 25 of James R. Brown's
proof. I think.
It's page 71 of, if you're in Olivia's proof, it's page 71 is the full table.
Do you have that Mr. Miller -Browning?
And then you were saying that you just wanted to have a look at that beside table 3 of Mr.
Brown's proof?
Yeah, so it looks like some of those comparables from Cushman and Wakefield's report have been
reported in this table three and an average is given.
And like I said earlier, the price per bed gives you
a useful cross -cheque on the valuation,
but it's not the basis form of the valuation.
As I've said, it's principally based on the yield,
the capitalisation yield, the rental values,
and the operational OPEX assumptions.
And then this average that is taken
from this snapshot of comparables,
I don't think it's appropriate to outline this average
because when you're looking at the capital values
and the price achieved per bed,
you want to take each asset in consideration.
So, for example, what's the micro location of each of these comparables listed?
What's the relevance and weight given to the Genesis cinema?
So, the comparables referenced in Cushman and Wakefield's report, some will have been
given more weight than others.
So, you can't just take an average price per bed and assume that because there are different
underlying valuation assumptions, site -specific assumptions that mean that you can't take
an average of all the investments completed in London and assume that that would be the
appropriate value per bed, for example.
Okay.
Just because we're already in Mr Brown's proof, I just want to ask you to turn back
to page 20, if you can.
So we just have this table and this is table one.
Yes.
And if we just look at the line total GDV.
So it's total GDV.
So there was a point made in the Appellant's opening
statement that you will have heard that your GDV
has increased over the past year,
which is said to be contrary to the direction of the market.
I was just wondering if you could talk me through why there have been changes.
So we have the THV June 2025 value and then we have the THV October 2025 value
and there are a number of different values for GDV and I was wondering if you could talk me through what the changes were and why.
So all the changes in gross development value have been made explicit within my proof of evidence
and within, I guess, going backwards in terms of the FEAs, they will be explicit within each relevant
the
initial valuation that was informed by
Cushman and Wakefield had an operational
opex assumption of £3 ,000 per bed and
during viability negotiations it is
quite common for concessions to be made
between viability consultants in order
to try and meet agreements with the
and so one of the large areas of disagreement was
operational assumptions.
So even though at the time of June or actually
October 2025, which is when the application was
determined, even though I thought that £4 ,000 per
bed, considering the evidence that I had
available to me at the time, was actually too
high, and even though Cushman and Wakefield were
advising me a lower operational value, I
decided to adopt £4 ,000 per bed to be closer to James R Brown and try to meet an agreement
because the way James R Brown reported the operational assumption included voids and
bad debts, whereas my operational assumption didn't include voids, so voids is when the
property would be vacant for.
So actually when I included my voids and bad debts, it was very, very similar if I was
at £4 ,000 per bed versus £4 ,500.
Yeah, it ended up being like £4 ,400 and something.
So we were very, very similar.
So I made that concession.
And also, it's probably useful to note
that these figures reported in this table pre the appeal.
We were also looking at different scenarios.
So I and the team were looking at the direct let scenario,
the nominations agreements and the affordable.
So some of these values, I can't tell without going into it,
might have actually been the direct let scenario,
because I think we were taking that as the principal agreement,
because there was no agreement that there would be a
nominations agreement at that time.
We were taking that value.
So there's a few differences and nuances.
So that's one of them that the appraisal related to the direct
let scenario, and now we're looking at the scenario with a
nominations agreement.
I made a concession going beyond what I thought would have been appropriate for the OPEX at 4 ,000 at the time,
in order to reach an agreement which was not made.
And so that's why, because there was a higher OPEX assumption, that valuation went down.
and then that 101 ,408, that is based on the gross valuation of the draught Cushman and Wakefield report.
So I think it's slightly confusing that this column has been included, given that it was a draught valuation,
not intended as a valuation in a particular point of time.
So I think if I'm correct, it looks like the $101 ,000
was based on a gross valuation, and then the $103 ,000 also
based on the gross valuation, but on the correct Cushman
and Wakefield valuation, which included the sum income.
So that's a kind of my best account of recording those changes over the time period of that table.
Okay, so you picked up there on operating costs and I think you basically covered this,
but you addressed this in your proof at paragraph 5 .22 onwards.
And just in light of what you said there, I just want to ask, so maybe just if you turn
up 5 .22 just so we're all on the same page, this is your proof of evidence, page 15.
And page 17 of the PDF.
And page 17 of the PDF, thank you.
So yeah, internal pagination 15, page 17.
So you've, at 5 .23, you said that you've adopted an operating allowance now of 3 ,750 per bed.
I just ask you to explain very briefly why you consider that to be reasonable.
Yeah, so this is based on comparable evidence.
So having a look at comparable evidence where the direct units looking at the operational
expenditure of different units and making an allowance for the fact that there is a
nominations agreement.
So if we go to the evidence, it's probably the best way.
So appendix 2 of my rebuttal, which is, I'll give you the page reference.
So page 49 of my rebuttal, 57 of the PDF.
Oh, sorry, of my main proof.
49.
And we are looking at table 2
So this gives a summary of different operational budgets assumed for different schemes.
So, for example, Calcutta House in that table is an assessment was done on the viability
of Calcutta House by SEBLS and this is the applicant's proposed operational budget of
3500 with a nominations agreement at 50 % and then we can also see other schemes to Trafalgar
way is also in the borough and then there are a few other operational assumptions listed.
So this gives you an indication of the operational budgets that I have looked at.
And then if we turn to just further on in the proof, if we go to appendix 3, to Cushman
Wakefield's report and then 69 of my proof of evidence PDF. There's a table with comparable
OPEX budgets. And then this table, Cushman and Wakefield, have analysed several comparables
which they've made anonymous due to confidentiality reasons,
as they will have spoken to the operators themselves,
would have want this information confidential.
So that's very common to kind of redact the site reference.
So we can see that they've looked at the number of bedrooms,
the room rating, the amenity rating,
the year of the OPEX budget and then they've looked at that OPEX budget per
bed including management fees and then we can see the range there that was
adopted and in Cushman and Wakefield's report if you look at the side next to
it they then they then say that they've applied a lower rate to the 50 %
Nominations agreement so the rate would be three thousand seven hundred and fifty per bed. So four thousand pounds for direct left and
3750 for
For rooms with the nominations agreement and that's the operational budget for all the rooms
But it includes the nominations agreement for 50 % of the rooms
And I think I explained earlier the reasons as to why the operational budget is lower
for nominations agreement, but that's the evidence that was relied upon in order to
inform the operational budget that was adopted at 3 ,750 for Genesis.
And just to speak up, just so we're clear on that last point you said, so you said,
I think it's clear from the way it's written, and these are the last two paragraphs on the
right -hand column of this page, is that where they're considering the assumption of a 50 %
nominations agreement, they've adopted a lower rate per bed, and that is a rate per bed as
in for each bed of the scheme, so they've reduced it, but it is, as you say, referring
to the scheme as a whole.
Yeah, it's referring to the whole scheme, the whole scheme including 50 % of the development
under a noms.
And you mentioned before reference to voids and your proof, there's reference again to
sinking fund which you said you haven't included. Can you just explain why you haven't included
a, or if you have included a sinking fund in your appraisal, as part of your OpEx costs?
So sinking sinking funds are sometimes seen in operational budgets and when I
say operational budgets I mean operational budgets for assets that are
that have been in operation for quite some time so not necessarily new build
assets but then may you may see sinking funds in in assets which have been held
for a very long time, so let's say an asset is 10, 20, 30 years old, they may include
some kind of sinking fund, but actually in terms of the looking at the operational budget
for this scheme, which is a new build scheme, there's already an allowance within the budget
for daily repairs and maintenance, general wear and tear that would be done, but for
sinking fund, the assumption is that for a sinking fund that's quite a major
upgrade that's necessary to the scheme so that you know might happen in
several years to come but that upgrade to the scheme shouldn't be
accounted for within the operational budget because it's not a yearly annual
That's an investment fund that's going to improve the asset.
And then that uplift in the improvements will then be captured within the rental value uplift.
So it's not something that either Cushman and Wakefield or I think is appropriate in the cases of Genesis Cinema,
where repairs and maintenance are already being accounted for,
to have a large sinking fund budget seems inappropriate in this context.
Okay, thank you. And in relation to voids, it was something that you picked up previously.
Have you accounted for voids in the OPEX budget?
So within my OPEX budget, I have not accounted for voids.
I've accounted for voids on the rooms that are directly let by the investor within my
appraisal.
I've accounted for a 98 % occupancy.
So there's a 2 % voids that's accounted for within my appraisal.
Okay.
So you say you are factoring voids to your appraisal, but it's already been taken into
account separately?
And again, I think that's the more appropriate way of approaching the valuation because it's
not part of the operational expenditure budget, the voids, it sits slightly separately, which
is why it's been appraised in that way.
Okay, so I just want to then turn on to a new topic on stabilised and non -stabilised
approaches to valuation.
So for this if I could ask you to turn up your rebuttal proof and I want to look at
page five.
So that's –
Just one question.
In Kushner's report they have these three scenarios which is as far as I understand
a scenario one is directly let scenario two is 50 % norms agreement and scenario three
is a nominations agreement but assumed there's a discount to the rental value because of that.
In your opinion how likely is it that that would be the outcome if there was a nominations agreement?
I mean in my head I'm thinking would the university have a bargaining power because they're
agreeing to take on so much at once? Maybe I'm misunderstanding how the process works.
I think it would depend on the specific
specifics between the University and the
the investor
As to whether they will be able to
negotiate any
suppress of the rents or not, but in this instance, we've assumed that the rents would not be
suppressed
as there is no affordable housing being assumed on the site which would be constituting rents
being suppressed. So yeah, that's why we're looking at Scenario 2, but they have appraised
it, but that was more when we were looking at affordable housing being on site, what
would the value be with affordable student?
I might have misunderstood that and I read that as meaning essentially in a market value
but they could just negotiate lower rents because they were agreeing to take on so much
at once.
Maybe I've misunderstood.
I don't think we can assume that that is what is meant by that.
My interpretation was that they were giving an option of having some affordable student
rooms in there as an appraisal option rather than the universities having that influence
on the rents.
Okay, I'll leave it there, I'm sure Mr Bourn will take it up if he wants to.
So we're just going to turn to stabilised and non -stabilised approaches to valuation.
So if you could turn up your rebuttals to CD 2 .2b.
And I just want to take you to page 5.
So this is Section 6 of your rebuttal proof.
Okay.
Okay.
So could you just explain very briefly what a stabilised approach to valuation is?
Yes.
Sorry, page 5, Section 6.
PDF reference 6.
Sorry, PDF 6.
So if you could just explain in brief terms what a
stabilised approach to valuation is.
Yes.
So a stabilised approach to valuation is
where you assume that the asset has had a period of
rental income after its completion.
So the development
completes and is ready to be
occupied.
And instead of a sale at the
completion the sale happens after a period that the development has been
left to students so it's been occupied so for example after 12 months there has
been a stabilisation period so a sale 12 months after practical completion with
students in occupation would be a stabilised version of of the of the
and there are differences in terms of risk associated with whether the development is
stabilised or not stabilised.
So if we're looking at the stabilised option, there is greater risk for the developer because
they have to take on the lettings risk of letting out the students before an investor
the investor buys the units but there is less risk to the
investor.
So that yield, the differences are reflected in the investment
yield and the profit on GDV, for example, because the profit
on GDV represents the developer's risk, the yield,
investment yield represents the risk for the investor.
And then in a non -stabilised valuation, that assumes that the
development is not sold with any students in occupation.
So it is sold at practical completion.
And so then the risk, there's less risk for the,
there's more risk for the investor buying the units
because they're not occupied.
And then in terms of the risk then to the developer,
developing the units, that depends on whether you assume
forward funding, where forward funding is an example where the investor commits to effectively
fund the construction of the development and guarantees the sale of the student assets.
So much less lower risk for the developer, more risk for the investor.
And then forward committed option would be where the investor agrees to buy the units
on completion but does not forward fund the construction.
And again, that's a non -stabilised approach to valuation.
And then I presume we have what is being referred to by the appellant as speculative,
which I understand but hasn't been made explicit, is not forward funded,
not forward committed, not stabilised, but speculative.
And so, again, none of those assumptions have been made explicit, but that is not a method
of valuation that I see commonly reflected within the market in terms of appraising a
development or how the market participant would appraise this development.
I understand that it's most common to value the valuation assuming some form of stabilisation,
and whether that is stabilised post -completion
or how I've assessed it in the rebuttal evidence
as a part stabilised where the development is pre -let
before sale happens, this is more common within the market.
But it is possible, you legitimately can value
the student accommodation based on either stabilised
or not stabilised with all these different assumptions that I've referenced, but you
just have to account for where is the risk in terms of each of these scenarios and making
sure that this is reflected in the appraisal assumptions, but it can be valued either on
stabilised or non -stabilised.
Okay, so just maybe partially answer that, but just in 6 .2 you explain how you've updated
your appraisal to reflect pre -let strategies and maybe just to make it very clear what
change did you make and why?
Yeah, so maybe just turning to that second part of the question why I made that change
and just going backwards even from that, I think throughout this process of viability
It was never made explicit what the terms, what the stabilisation was.
I didn't see anywhere explicitly in terms of is it forward funded, is it forward commit, is it stabilised, is it non -stabilised.
And so I had to make assumptions based on the appraisal that I had in front of me.
Now having conversations with Cushman and Wakefield who are active in the market at selling student accommodations,
they informed me that it would be very unlikely that an investment would be
made speculatively and that it's more likely that a developer would either
pre -let their development which by pre -let it means that whilst the
development is under construction they are letting, they are advertising the
units for students to let and the development is then pre -let at the time
of completion and then the sale upon completion to the investor, the development is then let.
So I would sort of call that a part stabilised approach and then so either that strategy
or strategy where the developer markets and how they do that in practise is that they
get a student operator on board to help them market the units and to stabilise the asset.
They would get a third party operator on board to support with that.
And then that would be another version of valuation, which is another version of sale
and acquisition, which is more common in the market.
So from speaking to Cushman and Wakefield and trying to understand exactly what the
applicant had done, but what my view of what a market participant would do.
Because in viability and valuation we need to look at this not as what a specific applicant
or developer strategy would do.
We need to look at what would, because the planning permission is tied to the land and
not the developer.
So I need to look at this as what do I think a rational, reasonable developer's strategy
would be in terms of selling this asset, stabilise, part stabilise.
And then upon this additional insight into the current depiction of the market,
I felt that a pre -let disposal strategy would be more appropriate
than a completely unstabilized version of sale.
And I felt like it sat in between both what the applicant was proposing,
what the other end of the market fully stabilised was proposing.
I felt like it sat in between and it was still appropriately,
you do still see sales being done with this pre -letter strategy.
So taking that into consideration, I then looked at my underlying appraisal assumptions
and I looked at my investment yield for example and thought,
can I still justify an investment yield at 5 %
considering this change in strategy?
And I felt that it was still appropriate to use a 5 % yield
and I felt like it was appropriate to look at both comparables
and actually if I perhaps show the reference of the comparables,
If we go back to Cushman and Wakefield's report.
If we go to the investment transactions, which is PDF page 71 of my proof.
So we can see that the type of sale, there's mostly operational sales on there and there's
a couple of forward funding and joint venture transactions.
Now I had referenced to this and felt that this part stabilised option, you would give
weight to operational investment transactions, because it's part stabilised and these are
when it says operational that's effectively the same as saying stabilised and then there's
a couple of investment yields so N16 Stratford is a forward funding option which has a 4 .6 %
and then we can see that the joint venture option
by Grove Crescent is a 4 .75 % yield.
So you can see that those yields of operational
and forward funding joint ventures are sitting
within a range, some are above 5%, some are below 5%.
And then I also had consideration. So if we go back to my rebuttal, let me find the correct paragraph reference.
So, is this where we were previously?
So I have referenced CD9 .21 and CD9 .22, but I think there was, basically some of the FEAs
that you'll see referenced within my proof of evidence and rebuttal refer to FEAs, either
done by Tower Hamlets or other boroughs.
I think some of those documents which are publicly available were supposed to be uploaded
to the core documents list, but I don't think all of them were amended to the core documents
list.
So where is that need for the direction of the site?
It's a 6 .9 is it?
Yeah, 6 .9 of my proof, page 6 of my proof of evidence.
I'm not sure if they are there.
So you don't know if I'm going to or I'm not going to use their evidence?
I don't think they are.
And there's a few others that were supposed to be in the core documents reference,
but I think it was just an administration miss.
Would there be any objection to those core documents being added
that are publicly available FEAs that I've referenced?
So those could be, so those can be added, okay, great.
So, yeah, at the moment not having those to hand.
So 6 .9 here.
These are financial viability assessments
which produced by DS2 which have also CP House
in Ealing and Neeson Goodyards.
They've also applied a pre -let strategy.
So similar to myself they have assumed that the development would be pre -let during construction and then sold on completion
And they looked at stabilised
investment yields to inform their valuation
so
That's taking into account that there is a reduced letting risks from pre letting the development. So
Just taking a wide range range of evidence
and
I can also, also just in appendix two of my main proof of evidence, which is page 50,
or page 58 of the PDF.
Again, this is the summary of the FEAs which will be uploaded to the core documents list
where it has...
PDF, if you're on the real one, it's internal pagination 50.
Table 3.
So comparable net initial yields.
So those are the FEAs that will be added to the core documents list so that you can see
exactly the valuation assumptions underpinning them, but I had reference to these and the
exact valuation assumptions that these all had.
So then going back to that point around what changes I made to the appraisal from proof
of evidence stage to rebuttal stage.
In order to reflect this pre -letting strategy, I maintained that 5 % yield was still appropriate
with the evidence that I had in front of me.
And bearing in mind, Cushman and Wakefield's report was based on a stabilised basis.
And then in order to reflect this change, I did need to make an adjustment to the appraisal.
So the start date for within the Argus appraisal where all the investment modelling happens,
you write a start date in that appraisal and there was a historic start date on the appraisal
of June 2025 which is when the application had come in originally and that wasn't updated
for the appeal scheme.
But in this rebuttal update as I was looking at this strategy again, I updated the appraisal
start date to October 2026 which was the date of the rebuttal.
And then that meant that I also needed to make sure that the sale of the development was happening at the start of the academic year,
because I was assuming it would be pre -let. I needed to make sure that the sale was happening at September 20, 2030,
which meant that I extended the development programme, so I added an additional month after completion,
because the completion was happening in August 2020 -30,
I added an additional month.
So this changed the overall development programme
from 47 months to 48 months.
And then because of that change into the cash flow,
my residual profit outcome actually reduced slightly.
So I write in my proof of evidence the difference.
So at 6 .5 it changed by 417 ,000 by reflecting that change.
But I felt like that change was appropriate in order to reflect the more market led strategy.
That's just, okay, that's 6 .5.
6 .5.
I did also, it's not included in my evidence, but I did also look at what would happen if
I valued it on a stabilised basis with 12 months of rental income and
because you're receiving rental income after
after
the completion has happened the
Residual profit valuation didn't actually change that much when I valued it based on a 12 -month stabilisation period so and end up
Including that in my evidence, but I did test that as well
Unless you have any questions, I was going to move on to finance rate.
I don't...
I have a question.
It's probably happened.
Sorry, it's taking a little bit longer than I thought, but I would suspect maybe another
20 minutes, perhaps.
So just in terms of finance rate, if I could just ask you to turn to your proof, your main
proof, page 24, which is where you cover this.
Sorry, at 20, so it's internal pagination 24, which on the PDF one should be...
26 PDF?
Yes, 26.
and I'm looking at figure four.
So the first question is just in terms of what evidence,
if you could just explain very briefly what evidence you relied on
in determining your finance rate.
Yes. So the finance rate is relied upon by various evidence.
So I think the reference that you've taken us to there is a list of PBSA GLA referrable
schemes.
And so I think those are from the last 18 months.
And these are finance rates proposed by applicants, so not by the local authority or by the GLA,
but this is what the applicants' finance rates have come in at.
So you can see a range in that table.
So I had reference to that.
I had reference to, I have a database of viability schemes within Tower Hamlets.
I think I reference how many applications that we've seen earlier on in the evidence.
It was a 6 .21 of your proof.
6 .2.
So just moving back to page, internal page 22, PDF page 24.
Yes.
So that page, those pages 21 and 22 are looking at the viability plan studies and how...
Just sorry, just paragraph 6 .21.
I think you mentioned there was a number of evidence -based...
Yes, yeah, that was what I was trying to get to.
Yes, thank you.
6 .21 of page 22.
So I looked over the last five years of all the viability
applications that we've had in Tower Hamlets, which is 301,
and I looked at all of the finance rates of those
developments and so the finance rates actually agreed upon, haven't been in excess of 7 %
at town Hamlet's council within those five years. But then I do reference that there
are two schemes of anomalies that sit outside of that range where the applicant has proposed
finance rates above 7 .5%, which I name it, 8 and 10 % there.
But those have not been agreed.
So that's another form of reference point I had with regards to finance rate.
And then I think importantly, probably one of the most important considerations
is the local plan viability studies.
So this is just so we're all following, this is what you discussed at 6 .12 of your proof.
Going back a further page, yes.
So yes, please just explain what page 21, yes.
So the PPG advises that viability assessments at application stage should refer back to
the viability assessment that informs the local plan and any inputs that deviate from
that should be provided.
There should be strong evidence to suggest any deviation to that now.
The viability study for Tower Hamlets was quite recent, so it was undertaken in July
2024 by BNP Paribas and that local plan is currently going under examination and the
evidence is still very much relevant to today's assessment.
And in supplement to that, the GLA have recently published their local plan, or their regional
wide viability study.
So 6 % was adopted for Tau Hamlet's local plan study, and then the GLA adopted 7%, and that
That was only in July 2026, I believe, so quite recent.
And so those finance rates gives you an indication
of what the market finance rate should be.
And within those adopted rates, within the local plan
and regional plan studies, they are inclusive of all fees
associated with the finance rate,
and also assumes an average of the funding structure.
So just to kind of explain a little bit how the finance rate works and viability
because it's quite hypothetical in nature.
So the appraisal that is relied upon for viability, the Argus appraisal,
always assumes 100 % of the development is funded by debt,
that there is no, you know, that it's not 60 % of the development is funded by debt
but that all of the development is funded by debt.
And in reality in the market that's not necessarily what happens.
It might be that 60 % of the development is funded by debt or 65 or 70 and some of that
is different, there's different tiers of that debt as well.
But in order for viability assessments and market appraisals, development appraisals
in general to be compared against each other in terms of whether this investment opportunity
is better than the next, it assumes 100 % debt finance.
And so what that means is that that finance rate has to reflect reality.
So even though it assumes, you know, 100 % at 7%, that 7 % has to reflect the different
structures of that funding.
What would we assume would be a reasonable average funding structure of that development?
So the local plan studies take all that into account and that finance rate is evidence -based
and includes the funding structure for the appraisal, which is 100%.
So I gave weight to that.
I gave weight to FBA assessments and I also looked at the evidence presented by the appellant.
I looked at the financial evidence provided by them and this to me was very specific.
the letters were addressed to Valour Genesis, the applicants.
They were very specific to the applicant.
Now I understand that in the development industry,
depending on who you are as an applicant will mean
that you will have access to different funding rates.
So you need to be very careful as a viability professional
to adopt finance rates specific to a specific developer
because a developer with a greater track record
may have access to more cheaper levels of funding.
So we have to do this on a basis that is standardised,
that is assuming a neutral market participant.
So considering that evidence, I gave more weight
to the local plan studies, to other FVAs adopted by applicants,
and also the knowledge that I have in order,
As I worked at Savills, I also have knowledge of what they're using in their red book valuation.
So I also have that external knowledge.
So all of this combined informed the finance rate that I adopted on this development, which is 7%.
And what I will also say is that as a council, we have not been static and we have not used 7 % throughout my time.
We were actually using 6 or 6 .5 % a couple of years ago, and with the pressures on finance,
that finance rate has moved up to 7%, so we have increased our finance rate, but not to
the extent that some applicants are pushing for finance rates to be much, much higher.
But again, we have to look at it as to what would, based on 100 % debt scenario, what would
be assumed an appropriate finance rate.
And just if I may add, in terms of,
I think you'll probably see reference to return on equity.
So if, say, 70 % of the development
was financed by debt, maybe 30 % is the cash, the equity.
And there'll be a return on equity required
to that proportion of capital.
But I believe that that return of capital, and what I know to be true from a lot of industry
professionals is that's captured within the return on cost or return profit on GDV.
So to account for that again in the finance rate would be to double count that return
on equity again within the finance rate is my view.
I believe that the appellant is taking a different view to that, but that's my understanding
of the finance.
Okay.
I just want to take you now just finally to some of the finance rate evidence that was
provided by Mr Brown.
If I could just ask you to turn up Appendix R. So this is within CD3 .4A, the viability
proof appendices and appendix R and it should start with the word brick flow.
Yeah, I've got that open.
So just if you scroll down first to page two, we have a table on page two of live market
evidence?
And do you see quoted rates?
Yes.
And just in your view, which would a rational developer go for a high or a low quoted rate
generally?
So I understand that most market participants, most developers are looking to minimise their
costs and maximise returns and values where they can.
So a prudent, efficient developer would look for
the most efficient terms of capital and interest rates.
So I would presume they would go for the cheapest
option of finance rather than an average
or the most expensive.
Great, and then just on page three,
Three, paragraph four. So, or just page three we've got the heading beyond the headline
rate, the cost of equity and mezzanine finance. They refer to headline rates and then there's
a line where this is all applied to the Genesis Cinema. Do you see that paragraph? It says
it's to fourth paragraph down applied to the Genesis Cinema and then there's a figure,
GDV 90 million, 420 thousand total project cost, 70 million.
Yeah, so for everyone's reference that's the third paragraph applied to Genesis Cinema above the table on that page.
Yeah, I think it's the fourth paragraph, so it's just the third paragraph below the bullet points.
The figures quoted for GDV and project cost, is Mr Brown's GDV for the appeals scheme
90 ,000, 420 ,000?
So I think that this document is out of date and that is based on a historic value but
I think it might actually be a net development value.
So if we open, I think one of the appendices within James R. Brown's proof has a summary
of the appraisals over time, we could cross reference that.
The appraisal over time is in Mr. Brown's proof at page 20 that we looked at the one
where we saw your GDV over time.
Page 20.
Just need to find.
Of his main proof.
That reference.
So of his main proof.
Page 20.
Is that his rebuttal?
Sorry, I think I might have to open that again.
So, appellate proof of evidence.
Sorry, when you go into the core documents list, then you go onto another one, it comes
out.
So I've got page 20, appraisals over time, so we can see the total GDV row and the total
net development value row.
So if we just keep on, because this is referring to GDV, which is gross GDV.
So the letter is referring to gross development value.
So that value should be if we look at the table and we look at JRB at 11th of September
should be 92 ,622 million.
Yes, so the, I think that is the, is that the James L Brown?
I think what the point is.
So his gross development value is, for the appeal scheme, is that 92 .6 to 2 million.
So about 2 million greater than that that's in the brick flow letter.
Yes, and I think that that brick flow letter is produced because it says 9 .42 million,
which if we look at that table, James R. Brown on the 31st of July 2026, there's a net development
value of 90 .4 million.
So one that's not the gross development value, it's the net.
But secondly, that value was before the yield was changed from 5 % to 5 .25%.
So it doesn't just, so it doesn't reflect the GDV that he's putting forward, it might
a historic net GDV but your interpretation of this letter is that it is referring to
the gross GDV, brick flow at least is referring to the gross GDV.
So that figure should be 92 million.
And then in terms of the project cost, again brick flow used the total cost of 70 million,
189 ,000.
Is that the total cost that's relied on by James R. Brown as part of or Mr. Brown as
part of this appeal.
So just to quote again that net development cost.
You just said total project cost, so $70 ,189 ,000, which I believe is total project cost without
finance, I would assume, since this is looking at finance, but you can tell me otherwise.
So my understanding of James R. Brown's appraisal, which I think is the first appendix to his
proof of evidence, is 96 million.
669 or 96?
Sorry, 69 million.
69 million, so that's from his FEA appraisal.
So roughly 1 million less than the costs in this brick flow.
Yeah, so that can be found by looking at the appraisal and looking at the cost before finance.
So how sensitive is Breakthroughs Analysis to the GDV and cost assumptions adopted?
My understanding is that it's quite sensitive to the assumptions used and that actually
if you take the actual figures of GDV and project cost,
where it says that there's a gap in funding,
that that funding would actually be met
if you use the stated GDV within the appraisal,
the actual project costs used in James R. Brown's appraisal
for the appeal.
then 75 % of 92 .62 million would be 60, with 69 million.
So actually 75 % of the current GDV would be higher than the cost before finance.
So in your view then, does this brick flow analysis reflect the finance rate that would
be available to the Genesis cinema, given these discrepancies?
I think the brick flow analysis is based on incorrect inputs and assumptions, therefore
I wouldn't give weight to their commentary because it's incorrect effectively based on
the appeal scheme where the appraisal inputs have changed.
And as I've said before, this brick flow letter
is very much addressed to the appellant themselves
and so can't be considered developer blind
and I would be cautious to give weight to that,
setting it in its context.
Okay, so one final question on this and then just about to finish.
So just if you move on to appendix S, which is the Savills one, and just scroll down to
page 4, and we see a text box at the end of page 4 which says sources and uses tie out
at 79 .17 million, residual profit to equity, and then it has in brackets GDV of 90 .42 million.
That gdv is the same gdv that was used by brick flow. Is that correct?
Yeah, so so I'm of the view that this is again an incorrect
gdv reported
So the assumptions again would be different by using the correct gdv again this looks like a historic net
Development value. Okay. Okay, and then just quickly on the site visit. When did you visit the site? I
visited I went on an official I had I have been to the I do know the site
quite well I know the area very well but the site visit with the appellant and
the cost consultant was done on the 6th of October 2026 and what was the purpose
of that site visit so the purpose of that site visit was to get an
understanding of the existing site itself, the general context and
surroundings, but it wasn't pivotal or it wasn't kind of underlying to the
valuation because my evaluation is based on the proposed scheme where the
existing site will be demolished and I already kind of had an understanding of
the nature of the location the context and then as for the
construction cost review by Ward Williams
This was desktop based and it was assumed that this
is appropriate to be desktop based given that a lot of the
Site
configuration could be found through the planning documents online and
and the development is being redeveloped.
In a scenario where the scheme is being refurbished,
there's more of an argument to say that the site visit is quite crucial
because you're looking at the existing fabric of the building that will be retained
and to refurbish that you want to understand the nuances of the building.
But in a scenario where it will be demolished, the site visit isn't as essential.
So it was more done to just cheque our desktop understanding of the context.
Okay, thank you.
I have no further questions, but if you just wait there, I'm sure there may be some, or
we might have a break.
Thank you.
Thank you.
Mr Warren, it's how would you like to approach in terms of cross -examination?
Well, we obviously need a break come what may.
What's in my mind though is I was going to ask, let me put it this way, I was going to
ask for a slightly longer break than normal anyway, I think whenever we finished, for
two reasons.
I've got three or four things that have arisen, no complaints, that I do need to cheque with
Mr Brown.
I would also quite like, if possible, to have five minutes with my learning friend, and
And I don't mind whether the valuers are there, both of them, including Mr Mello Brown for
that, just to talk about this point on review.
But I'm quite happy to start with my later friend, I mean, Will.
And I was going to do that now.
But if we were to take a slightly longer break, I think that would take us to quarter past,
you know, 20 past four.
And it is, I think, much more questionable whether it's worth starting the cross -examination
at that point today for a couple of reasons.
One is that it's very difficult to segment the beginning of micro -examination because
I'm starting with the biggest, most value -important topic, the PBSA value topic, and that's really
that is more than that.
I mean that's an hour probably, it's the majority of what I'm going to be asking about, to be
honest.
And so at the moment, I gave a three -hour estimate.
I think that's, even as things stand at the moment, probably an overestimate.
But I just want to give you a bit of comfort about the programme.
So if I don't start tonight, then I'm subject to something about the review.
I'm quite happy to impose, or have you impose upon me a binding time limit for my cross -examination of an hour and three quarters or something like that.
I think I can get through it all if I start tomorrow after Dr Mealy's return.
Okay, I think I'm wondering whether...
Yes, I mean I have to impose for example say two hours because I think we'll still get through it all by one o 'clock.
Oh yes, oh yes.
Even with Dr. Meade having a short session first.
So, subject to what is the outcome of your discussion, because it might be an answer
to the question which you're going to tell me is irrelevant, quickly.
I'm wondering whether one possible outcome of that though is that you might want to do
a little bit more in chief on that topic and then go into cross -examination on everything
including that topic.
Maybe, maybe.
Maybe another reason for delaying until tomorrow so we could work it out.
We could we could do I mean obviously a massive man in front but we could do
That might be an outcome and we could use a bit of the rest of the day for that
But I I think it's unlikely to be honest
If you wouldn't mind giving us a little bit more time just to have that discussion as well as the break
Then we can come back to you
I wanted to say that all rather than say let's knock off now have 50 minutes and then come back and say let's stop until
Tomorrow that would have made much sense
So I've said it all now
Okay, but then if we break till then now, do we just break entirely?
That would be my suggestion to be honest.
And if Benenfer wants to do a bit more examination in chief on that point, on the review point, then fine, absolutely fine.
I think it's unlikely but I will, as I said, I'll take instructions and have a discussion with, I'll hear what Mr Warren has to say.
My site preference would be just to keep things, I understand where Mr Warren is coming from,
but obviously it does seem if we have a good hour and a half left of the day, it just seems
like maybe we should be using it just in case, who knows how long the rule 6 party might
need in the morning tomorrow, and just the general programme, we're kind of in a lucky
position to be finishing early, but that would just generally be my approach, but obviously
I'm in your hands, sir, and what you think is most appropriate in the circumstances,
but I agree that we should have a break and we'll discuss these points with the other
side.
Okay, well I think Mr Brawn's already made it clear he doesn't think it would work very
well in terms of the break -up of his cross -examination if we started, so I am happy to break till
tomorrow. But yeah, that's on the proviso that I expect to be finished with this witness
by one o 'clock.
Absolutely, yeah.
So you seem confident that's going to happen.
Okay, and then we'll be on track still.
Can we just use this just as a moment then
before we break up for the day,
just to make sure on top of things more generally.
So CD 9 .2 .1 and 9 .2 .2 are gonna be added
to the core document list.
There's a few that basically.
There more than those two.
Yeah, it was all of those referenced in that table.
I can't find the reference right now.
I think there's five or six FEAs to be added.
So it makes it easier rather than using the planning reference from the planning portal.
Okay, let's add them and then obviously Mr. Warren has a chance to question you on them
if he wishes to tomorrow in cross -examination. Thank you. And then there was a couple of
other things, I'm just reminding myself. Are we going to add an elevation in colour of
the thing we were discussing with Dr. Mealy.
We're very interested in this subject.
I mean, we had a question like this over lunch.
By the way, our politics have been asked to create that.
Okay.
I think we should.
I mean I've seen a harm in doing it and it was for completeness.
Yeah, it wasn't a harm, it's not a new scheme, it's just an annotation basically.
Yeah, I mean except for validation purposes we didn't ask for it, so we're saying we don't need it, but we're happy for it to be produced if it would be of assistance.
Okay, thank you. And then there was going to be the case law on bits of an adjacent building not being curtilaged.
If I'm... That might be not quite a precise example of what that shows, but that Dr Mealy mentioned.
I'm just trying to get Mark's kick off.
Yeah.
Just keep going back.
Were we going to ask for the Council's 2016 guidance on local listings within conservation areas as a document?
I know Dr. Mealy referred to it in evidence, I'm not sure if you were happy with the way
it was addressed, I think it was common ground that the document didn't contain a policy
that said you shouldn't locally list buildings.
I'm happy for it to be introduced.
So am I, I'm not sure you need it to be honest.
I don't have any objections to it going in, he did mention it.
But I don't think it's sufficiently important if you've got the point to look at the document itself.
Okay, then leave it out. That's fine.
Okay, I think that's everything from my side. Anything else?
I'm just going to have a quick look at that and hopefully get that to you and can copy
the appellant in overnight or before the end of the day, given that we're finishing early.
Okay, thank you.
Could I just confirm, is it just between cross -examination that I'm not allowed to speak to the team or after?
No, it's now.
From now.
You can't talk to the team.
You work for the council, so presumably you're just going home rather than the hotel.
So, not an issue like it might be otherwise.
I understood just from what Ms. Rowan is saying that if we did want to have a full...
If both sides agree for that meeting to talk to each other then of course.
Thank you very much.
Okay.
In that case we'll adjourn and we'll resume in the morning at half nine.
Okay.
Thank you.